Laserfiche WebLink
I 4 <br /> j t <br /> Cl(CL0 PURGE <br /> WITH <br /> ACTIVATED CARBON <br /> AN UNBEATA13LE COMBINATION <br /> r� <br /> 9 <br /> i <br /> ONE 204#CANISTER OF GRANULAR ACTIVATED CARBON COSTS UP TO <br /> $500 TO HAVE REGENERATED OFFSITE BY A TYPICAL SERVICE <br /> d REGENERATING ONSITE USING THE CYCLO-PURGE SYSTEM COSTS <br /> LESS THAN$6 IN ELECTRICITY ' <br /> j d GAC INVENTORY CAN BE HELD TO A MINIMUM BECAUSE OF THE b <br /> • I <br /> EIGHT HOUR TURN-AROUND TIME FOR A PAIR OF CANISTERS <br /> ONE CANISTER PER WEEK ON AN ACTIVE PROJECT COULD COST UP TO <br /> $25,000 PER YEAR. BULK RATES MIGHT COSI`500%less. <br /> d USING THE CYCLO-PURGE WOULD REDUCE THAT COST TO ABOUT$300 per yr. <br /> a/ THE SAME CYCLO-PURGE UNIT COULD EASILY SERVICE 7 SUCH SITES <br /> WORKING A SINGLE SHIFT. POTENTIAL REVENUE SAVED COULD EXCEED <br /> $100,000 PER YEAR,EVEN WHEN ACCOUNTING FOR LABOR COSTS <br /> j <br /> Copyright WASTEMIZEIR CORP., 1991 <br /> I � <br /> ; <br /> j <br /> I <br />