My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0008156
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1448
>
3500 - Local Oversight Program
>
PR0544673
>
ARCHIVED REPORTS XR0008156
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 3:13:36 AM
Creation date
7/18/2019 3:27:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008156
RECORD_ID
PR0544673
PE
3528
FACILITY_ID
FA0006182
FACILITY_NAME
REGAL STATION #604
STREET_NUMBER
1448
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
1448 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R604 UPDATE 14 12-28-1992 <br /> inch) is fitted with a 1/4 inch pipe to tubing fitting for <br /> obtaining vacuum/pressure and temperature readings A pipe to <br /> hose 2 inch union 3s placed between the tee and the 2 inch PVC <br /> flex hose that connects the well to the extraction manifold At <br /> the manifold the individual wells are connected to their own 2 <br /> inch PVC riser (36 inch in height) with an orifice plate and a <br /> gate valve at the top of the riser. Vacuum/pressure ports are <br /> located on either side of the orifice plate Each orifice (well) <br /> has its own manometer (calibrated in millimeters (mm) water) <br /> which are connected to the ports for continuous measurement of <br /> flow from a particular well All the extraction wells are <br /> manifolded together above the gate valve to a set of two orifice <br /> risers that are in parallel before the vacuum pumps After the <br /> vapor stream leaves the manifold, it flows through a moisture <br /> drop out drum (55 gallon 17E) and then is pulled into the pumps <br /> (two Rotron DR505 placed in series) before entering a second <br /> moisture drop out drum and then into activated charcoal vapor <br /> scrubs If breakthrough occurs through the 1st carbon, this <br /> carbon is removed from the system The #2 carbon is then placed <br /> at the #1 position and a new carbon placed on the exhaust as the <br /> #2 carbon <br /> A portable ambient air PSD-GC (Photovac 1OS50 packed column) was <br /> used at the site to sample for breakthrough of the carbon scrubs, <br /> the influent and effluent of the system, and the influent from <br /> the various vapor extraction wells Before sampling the wells or <br /> the system, a calibrant made from fresh gasoline is infected into <br /> the GC-PID The resulting chromatogram has numerous responses . <br /> The microprocessor of the GC-PID computes the area per response <br /> in volt seconds, and assigns a peak number and retention time <br /> The sum of all the responses are then used to obtain a mg/L per <br /> volt second calibrant factor This factor 1s used to calculate <br /> mg/L as gasoline vapor from each analysis Pounds per day can <br /> be computed using these mg/L values, and the pressure <br /> differential created at the orifice (flow rate) for each well, <br /> and total influent Since September 25 , 1992 , tedlar bag samples <br /> are obtained and brought back to be analyzed in the WEGE portable <br /> laboratory This is necessary due to long eluting time (analysis <br /> time increased from 10 minutes per sample to 30 minutes per <br /> sample) needed per analysis using the 10s50 (all early eluding <br /> compounds have been removed by vapor extraction) The pounds per <br /> day values for each well and the influent are then averaged to <br /> the preceding site visit ' s pound per day value and then <br /> multiplied by the number of days the system operated between <br /> visits to estimate the total pounds each well and the total <br /> system has removed for that time period This poundage is then <br /> added to the accumulated poundage of the previous visit to update <br /> the total pounds removed to date, see Table 3 and Appendix B <br /> Sampling Vapor Streams. <br /> The vapor samples are obtained by attaching a dedicated air tight <br /> soft polytubing to a sample port on the well side of the orifice <br /> page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.