Laserfiche WebLink
UPDATE 28 8-02-94 <br /> produced an anomalous high when used From these gradient lines, <br /> • data points representing the contact for the proposed contours <br /> are plotted along each individual line Once the data points <br /> have been plotted between all the wells, the data points <br /> representing a given gradient elevation (-45 foot contour, for <br /> example) are connected with site specific factors, "i e . " <br /> incorporating conditions caused by local geology, hydrogeology, <br /> utility trenches, etc These are used to control the contour <br /> between data points This site is presently being influenced by <br /> vapor extraction at MWS, VSB3 , VSB5, VSB9 and VSB11 A vacuum at <br /> these wells and surrounding wells will influence the shape of the <br /> ground water surface and subsequent flow directions of the ground <br /> water To obtain representative measurements that show the <br /> influence by the vacuum extraction at this site, a vacuum <br /> measurement is obtained at the well head before removing the cap <br /> and the subsequent depth to water measurement is corrected for <br /> the negative vacuum head (potentiometric head) <br /> Vapor Recovery System and Monitoring <br /> During the latest confirmation soil sample drilling which <br /> occurred on February 2 , 1994 , SB13 , SB14 and SB15 were converted <br /> into vapor extraction wells These wells along with P3 , VSB5, <br /> VSB9, VSB11 and MW5 are presently be utilized for vapor <br /> extraction, see Figure 3A These wells have been manifolded <br /> into the laterals of the above listed wells that are manifolded <br /> to a vapor extraction system with individual valved orifices for <br /> flow control and measurement . The wells are fitted with a PVC <br /> tee head with a locking air tight cap, for well access The tee <br /> lateral (2 inch) is fitted with a 1/4 inch pipe to tubing fitting <br /> for obtaining vacuum/pressure and temperature readings A pipe <br /> to hose 2 inch union is placed between the tee and the 2 inch PVC <br /> flex hose that connects the well to the extraction manifold At <br /> the manifold the wells are connected to their own 2 inch PVC <br /> riser (36 inch in height) with an orifice plate and a gate valve <br /> at the top of the riser Vacuum/pressure ports are located on <br /> either side of the orifice plate Each orifice (well) has its <br /> own manometer, calibrated in millimeters (mm) water, which are <br /> connected to the ports for continuous measurement of flow from a <br /> particular well All the extraction wells are manifolded <br /> together above the gate valve to a set of two orifice risers that <br /> are in parallel before the vacuum pumps After the vapor stream <br /> leaves the manifold, it is pulled into the pumps (two Rotron <br /> DR505 placed in series) and then into activated charcoal vapor <br /> scrubs If breakthrough occurs through the 1st carbon (5 pounds <br /> per day or greater release of gasoline range hydrocarbons) , this <br /> carbon is removed from the system The #2 carbon is then placed <br /> at the #1 position and a new carbon placed on the exhaust as the <br /> #2 carbon <br /> A portable ambient air PID-GC (Photovac 10550 packed column) was <br /> used at the site to sample, the influent and effluent of the <br /> system, and the influent from the various vapor extraction wells , <br /> for breakthrough of the carbon scrubs Before sampling the wells <br /> or the system, a calibrant made from fresh gasoline is in3ected <br /> page8 <br />