Laserfiche WebLink
POWER LINE. -- - , <br /> HARDING WAY <br /> PCIV A POLE MW-4 <br /> S84 <br /> pianlerMw-6 <br /> I <br /> ------------- <br /> 20 <br /> • I � <br /> 1 1 <br /> l \ <br /> 1 <br /> 13' A EA <br /> r13' �' <br /> ' '�' SB <br /> 3F <br /> 20. r <br /> 1 10. r <br /> \ t 1 <br /> EL DO DO i P3 <br /> REET '� �.' I {rf r ; SBiO MW-21 <br /> � r <br /> ® • <br /> P, EA SFr ;� 2 SBa <br /> 3 <br /> SBI �� �. tii M W- <br /> STO E <br /> r <br /> 1 <br /> 5 <br /> r 5 <br /> . -3 AREA B 5 <br /> 5 <br /> l <br /> FIGURE 3A <br /> SITE BASE MAP <br /> SHOWING LATERAL <br /> EXTENT OF SOIL PLUME <br /> AND AREAS EXCAVATED <br /> ® SOIL BORINGS DESTROYED •M W-7 <br /> O VAPOR EXTRACTION <br /> P3 WELL <br /> ® SOIL SAMPLE BORING <br /> SBI LOCATION <br /> GROUND WATER MONITOR Q' 2 5 5 O <br /> ELL LOCATION <br /> If DIRECTIONAL <br /> NOO L <br /> OWIITH BOTMONITOR <br /> OM H OLE SCALE 1 INCH = 2 5 ' <br /> NORTH <br /> 27 <br />