Laserfiche WebLink
r <br /> a <br /> CYCLO PURGE <br /> ► - <br /> ACTIVATE® CARBON <br /> AN UNBEATABLE COMBINATION <br /> d ONE 2000 CANISTER OF GRANULAR ACTIVATED CARBON COSTS UP TO <br /> r <br /> $5D TO HAVE REGENERATED OFFSITE BY A TYPICAL SERVICE <br /> of REGENERATING ONSITE USING THE CYCLO-PURGE SYSTEM COSTS <br /> LEW THAN$6 IN ELECTRICITY <br /> of GAC INVENTORY CAN BE HELD TO A MINIMUM BECAUSE OF THE �r <br /> EIGHT HOUR TURN-AROUND TIME FOR A PAIR OF CANISTERS <br /> d ONE CANISTER PER WEEK ON AN ACTIVE PROJECT COULD COST UP TO <br /> $2.5,000 PER YEAR. BULK RATES PMGHT COSY 5V16 IeSS. 'I <br /> d USING THE CYCLO-PURGE WOULD REDUCE THAT COST TO ABOUT$300 per yr. <br /> �t <br /> d THE SABLE CYCLO-PURGE UNIT COULD EASILY SERVICE T SUCH SITES 't <br /> Wr,D'JNG A SINGLE SHIFT. POTENTIAL REVENUE SAVED COULD EXCEED <br /> $1u0,000 PER YEAR, EVEN WHEN ACCOUNTING FOR LABOR COSTS <br /> In <br /> Copyright WASTEMIZER CORP.,1991 <br /> I� <br /> i� <br /> F � <br />