Laserfiche WebLink
Stockton , is located near the intersection of Tam U Shanter and <br /> Swain Road; ( Plate IV. ) Other wells that were located are owned by <br /> California Water Service; the location and number of wells near the <br /> subject propertv are shown on Flate IV. <br /> DEF'-1H TO WATER TABLE: <br /> Accordzno to the latest published map issued by the San Joaquin <br /> County Flood Control and Water Lonservatzon District , (Flate V, ) the <br /> water table at this location is appro< zmately -4o feet , or about 58 <br /> feet below ground level ' <br /> REVIEW OF WORK DONE SINCE BEGINNING OF PROJECT : <br /> On March 29, 1989 , Jim lhorpe Oil , Inc. performed an annual Tank � <br /> System lightness test on a 1 , 000 gallon underground gasoline storage <br /> tank located at 6215 Tam O Shanter Drive, Stochton , California- The <br /> tanh tested satisfactorily, but a collar leak was noted in the <br /> product line , which was bled down and capped o+ f prior to the test' <br /> On June B, 1989, Jim Thorpe Oil , Inc . fz1ed a Fermanent C] osure/ \ ank � <br /> Removal Plan to the SJLHD for the above referenced tank ' The plan / <br /> | <br /> was approved , with conditions , on July 7 , 1989. Required soil tests � <br /> specified by Lhe SJLHD were BTX&E, TFH-6 , EDB, and TEL. (R8fyr to | <br /> E:hzbxt D and Plate VI for details. ) <br /> On JuIy 12, 1989 , Jim [horpe Oil removed the UST and appro zmately <br /> 25 cubic yards of spoIl ' A stronq gasoline odor was rioted , and <br /> discolored soil was observed at the west end of the e cavatzon near | <br /> / <br /> the pump island and fill end of the tanh ' Samples were taken at the <br /> east and west end of the tan| 8ppro: zmatelv i2 below ground le.ei , <br /> and 2 below the bottom of the tank : (refer to F-late VII and E .hzbzt <br /> F. ) Samples were collected in brass tubes by Canonze Laboratory <br /> personel under Chain-of-Custody, (see E,hibzt E' ) The spoil waa <br /> returned to the hole, covered with plastic , and appro. imatel / 6 � <br /> cubic yards of clean fill was added to bring the e` cavatzon bach to <br /> grade' <br /> The samples were analyzed on July Z1 , 1989 , and showed detectable <br /> levels of BTX&F, EDB, and TFH-G Ln the sampie +rum the west ond of <br /> the tan[ , (.:.,W' ) The sample -At the eusc ond , 1E , showed ail tested <br /> substances to be below reporting leve] ,., tTable i ' / <br /> � <br /> On October 10, 1989, Jim Thorpe Oil submitted a Site Re-E` cayatzon/ � <br /> Resample WorV Plan to the SJLHD; ,E<hzbit G. ) Upon receiving verbal � <br /> approval to proceed from the SJLHD, Thorpe Oil moved onto location � <br /> On January 19 , 1990, and removed the clean fzli dirt , plastic , and <br /> spoil which had heen returned to the hole after removznq the UGT and <br /> � <br />