Laserfiche WebLink
cement/bentonite slurry mix using a tremae pipe or other suitable <br /> equipment, grouting operations will be witnessed & supervised by <br /> a representative of the County EHD <br /> 9 Soil & water samples will be transported under chain of <br /> custody to FGL laboratory with instructions to test for BTEX & <br /> TPH-G using detection limits as specified by the County EHD_ <br /> 10 The method(s ) of disposal of drill cuttings, core samples, <br /> and fluids from these soil borings and prior activities will be <br /> determined after the results of all laboratory results have been <br /> analyzed_ The County EHD will be contacted prior to any action <br /> taken <br /> Upon completion & sampling operations, and analysis of laboratory <br /> analyzes , a report will be prepared and submitted to the County <br /> EHD for review and response <br /> Our client is prepared to proceed with this project as soon as <br /> approval is received from the County Environmental Health Depart- <br /> ment. <br /> Wi 'am J. Hunter <br /> Wm J. Hunter & Associates <br /> No ember 5 , 1993 <br />• <br /> 5 <br />