My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0010485
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TAM O SHANTER
>
6215
>
3500 - Local Oversight Program
>
PR0544683
>
ARCHIVED REPORTS XR0010485
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2019 3:12:10 PM
Creation date
7/22/2019 8:14:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010485
RECORD_ID
PR0544683
PE
3528
FACILITY_ID
FA0004953
FACILITY_NAME
NORMAC INC
STREET_NUMBER
6215
STREET_NAME
TAM O SHANTER
STREET_TYPE
DR
City
STOCKTON
Zip
95209
APN
09405011
CURRENT_STATUS
02
SITE_LOCATION
6215 TAM O SHANTER DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> July 12, 1999 - UST removed along with about 25 CY spoil . Strong <br /> gasoline odor" noted , and discolored soil observed at west end of <br /> tank near pump island. Three (3) soil samples taken; one at each <br /> end of the tank and one about 2 ' below the tank.. Samples delivered <br /> to Canonie labs under Chain--of---Custody. Spoil was returned to hole. <br /> July 31 , 1989 Sample analysis completed; see Table 1 for results. <br /> January 19-23, 1990 - Site re---entered , existing spoil removed , and <br /> an estimated 300 CY of additional spoil was removed , which resulted <br /> in a pit approximately 30 ' long X 19 ' wide X 21 ' deep. A total of <br /> seven (7) samples were collected, (see Plates IX & X , ) and were <br /> transported under Chain--of--Custody to FGL Environmental Laboratory <br /> for analysis. The spoil was placed on plastic on an asphalt storage <br /> area, and covered with plastic. <br /> February 12, 1990 -- FOL Environmental issued laboratory analysis of <br /> the above samples; refer to Table II for test results. <br /> The results of the lab tests showed that the two bottom samples <br /> • showed very minor amounts of BTX&E, and no detectable levels of <br /> TPH-G, EDB, or organic lead. The sxdewall samples on the northeast , <br /> east , and southeast portions of the pit were clean. The two <br /> sidewall samples on the northwest and southwest end of the <br /> excavation revealed law levels of Toluene, Xylene, and Ethyl <br /> Dibromide. Only the sample on the southwest side of the pit , <br /> (SW-2W, ) showed detectable levels of TPH-G. <br /> June 20, 1990 - Correspondence from EHD requiring a work plan for <br /> borings and/or groundwater monitoring wells. <br /> In order to define the extent and configuration of the plume, we are <br /> submitting the following Workplan for your review. Work will <br /> commence as soon as approval is received from your office. <br /> PROPOSED WORKPLAN: <br /> 1 . Drill five (5) 4" auger holes to a maximum depth of 40 ' at the <br /> approximate locations shown on the attached Exhibit A. If it is <br /> logistically feasible, boring No. 8--2 will be started from the <br /> bottom of the existing excavation. If that is not possible, it will <br /> be located as close to the side of the pit as possible. <br /> 2. Split-spoon soil 13amples will be taken at 1 ' °w 5 ' , and every 5 ' <br /> to and including the bottom of the each boring. The lithology will <br /> be described , and samples taken and/or supervised by a Registered <br />• Geologist. Upon completion of this phase of the work , all borings <br /> i <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.