Laserfiche WebLink
2. Drill six (6) 6" auger holes at the approximate locations shown <br /> on Plate I. Auger holes to be drilled to about 35 feet bgl or to <br /> depths sufficient to allow sampling the sand layer encountered at <br /> about 30' in the previously drilled boreholes; refer to Plate II . <br /> 3. Cuttings from each borehole to be described and logged by the <br /> R. G. as drilling proceeds. <br /> 4. Split-spoon samples will be taken every 5 feet from 15' bgl to <br /> the bottom of each boring using properly prepared brass tubes. Each <br /> sample will be briefly described, sealed, labeled , and placed on ice <br /> pending transport to FGL laboratory for analysis. <br /> 5. Soil samples will be transported to FOL Environmental under <br /> proper chain-of-custody, with instructions to test for BTEX using <br /> EHD approved detection limits. <br /> 6. Drill cuttings will be placed in properly labeled and sealed <br /> steel drums and stored onsite pending results of the laboratory <br /> analyses. <br />. 7. All boreholes will be properly grounted with cement from total <br /> drilled depth to the surface in accordance with County regulations. <br /> All drilling and sampling operations will be supervised by a <br /> Registered Geologist, and witnessed as necessary by a representative <br /> of the EHD. <br /> Programs for further work will depend upon the results of the <br /> laboratory anal ses. <br /> William J nter <br /> cc: Normac, Inc. REDGC ee, <br /> 0G' <br /> Sprectrum Exploration. � OLLIMf1HNER <br /> * NO 860 <br /> OF CAL1F���P <br /> 3 <br />