Laserfiche WebLink
r ti i'r <br />• UALITY ASSURANCE AND QUALITY CONTROL PLAN <br /> The Remedial Investigation (RI) Quality Assurance/Quality Control (QA/QC) program is <br /> intended to facilitate the acquisition of accurate and reliable data Environmental data gathered <br /> during the RI will be collected and analyzed following procedures prescribed in the Quality <br /> Control Program. A Quality Assurance Program has been established to assure that the Quality <br /> Control Program is effective Both programs are necessary to provide accurate data and <br /> documentation for investigations and laboratory analyses. The following field and laboratory <br /> procedures will be implemented to ensure that QA/QC objectives are met. <br /> 1.0 RECORDING OF FIELD DATA <br /> All information pertinent to the field investigation will be kept in a field log book Information <br /> to be documented includes at least the following. <br /> Sample numbers <br /> i - Locations of sample collection <br /> Soil boring or well numbers, as applicable <br /> Depths at which samples were obtained <br /> Names of collectors <br /> Dates and times of collection <br /> - Purpose of sample <br /> Sample distribution (e.g laboratory, archive, etc.) <br /> Field observations <br /> Field measurements (e g PID readings, pH, conductivity, water levels) <br /> Other data records (e g development log, soil sampling report, well log, etc ) <br /> 2.0 SAMPLE CONTAINERS <br /> Groundwater samples will be placed in containers supplied by the analytical laboratory Table <br /> 1 summarizes the required sample containers <br />