My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0010494
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TAM O SHANTER
>
6215
>
3500 - Local Oversight Program
>
PR0544683
>
ARCHIVED REPORTS XR0010494
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2019 3:04:20 PM
Creation date
7/22/2019 8:16:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010494
RECORD_ID
PR0544683
PE
3528
FACILITY_ID
FA0004953
FACILITY_NAME
NORMAC INC
STREET_NUMBER
6215
STREET_NAME
TAM O SHANTER
STREET_TYPE
DR
City
STOCKTON
Zip
95209
APN
09405011
CURRENT_STATUS
02
SITE_LOCATION
6215 TAM O SHANTER DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M N(1r7 <br /> Quality Assurance/Quality Control Plan Page 7 <br /> An acrylic Surface Sampler will be used for visual inspection of the groundwater in order to note <br /> sheens (difficult to detect with the Interface Probe), odors, microbial action and sediments The <br /> sampler is calibrated in inches and centimeters for visual inspection of product thickness <br /> To reduce the potential for cross contamination between wells, the monitorings will take place <br /> in order from the least to most contaminated, if known Well containing free product will be <br /> monitored last Between each well monitoring the equipment will be decontaminated <br /> Water level data collected from the wells will be used to develop a groundwater contour map <br /> for the protect site Groundwater flow will be estimated to be perpendicular to equipotential <br /> lines drawn on the map <br />. 10.0 WELL DEVELOPMENT PROTOCOL <br /> Groundwater monitoring wells will be surged and developed pnor to setting the surface seal <br /> Approximately 10 times the volume of water in the casing will be withdrawn if possible Casing <br /> volumes will be calculated in the following manner- <br /> VOLUME OF SCHEDULE 40 PVC PIPE <br /> DIAMETER I D VOLUME <br /> (inches) (inches) Gal/linear it. <br /> 2 2067 017 <br /> 4 4 026 066 <br />
The URL can be used to link to this page
Your browser does not support the video tag.