Laserfiche WebLink
Ma r, 18. 2014 1: 57PM No. 0767 P, 5 <br />Encroachment Permit, Number400 <br />Special Conditions <br />Page 2 of 2 <br />elected officials, officers, agents, and employees) from and against any and all claims, <br />demands, damages, liabilities, costs, and expenses resulting from or arising out of the <br />performance of the construction work by the Permittee or its authorized representatives) <br />and/or their agents, representatives, its authorized representative (s) or employees. <br />7. The Permittee or its authorized representative(s) shall obtain written permission(s) or <br />agreement(s) for work that are to be performed by the Permittee or its authorized <br />representatives) outside City's right-of-way and /or easements, all at the Permittee or its <br />authorized representative(s)'s cost and expense_ <br />8. The Permittee shall also notify owner(s) and/or operator(s) of existing public utilities <br />including AT&T (telephone and fiber optic facility), PG&E (gas and electric), Comcast <br />(cable TV), and others, prior to the start of work around or adjacent their facilities, or <br />work that may affect their facilities. The Permittee shall comply with all the utilities <br />owner(s) and operator(s)'s requirements, all at the Permittee's sole cost and expense. <br />The Permittee shall install or apply 2 inches thick asphalt concrete overlay 25 feet from <br />both sides of the utility trench or pavement excavation. In order to retain existing <br />pavement grades or street cross slope, the Permittee will be required to grind the <br />existing asphalt concrete pavement to a uniform depth of 2 inches over the entire area to <br />be applied with asphalt concrete overlay, If the utility trench or pavement excavation <br />encroaches on the next travel lane or crosses the centerline of a two-lane street or alley <br />way, the extent of asphalt concrete overlay shall be the entire width of the adjacent <br />travel lane or the entire width of the street or alley way for a two-lane street or the alley <br />way. <br />The Pavement restoration work required under this sub -section must be completed by <br />the Permittee within thirty (30) calendar days from the date of issuance of this permit <br />unless changed in writing by the City Engineer. <br />10. After the completion of work, and prior to obtaining City's Engineering Inspector's <br />signature on the encroachment permit, the Permittee or its authorized representative($) <br />shall provide the City as -built drawing(s) that reflect changes that were made during <br />construction such final location of affected and relocated utility(s) or improvement(s). <br />Portion of this Page Intentionally Left Blank <br />RECEIVF,-D <br />MAR ? 8 2014 <br />ENVIROmm,= , <br />A! PEALTH <br />02-060313cm D riVJEtV..I. <br />