My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
12333
>
2800 - Aboveground Petroleum Storage Program
>
PR0527892
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2019 2:44:15 PM
Creation date
7/23/2019 1:34:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527892
PE
2832
FACILITY_ID
FA0010532
FACILITY_NAME
GIGLI CO INC
STREET_NUMBER
12333
Direction
S
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19123011
CURRENT_STATUS
01
SITE_LOCATION
12333 S MANTHEY RD BOX C
P_DISTRICT
003
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S A N G UQ U l N Environmental Health Department <br /> —COUNTY---- <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: I Facility Address: Data: <br /> GIGLI CO INC 12333 S MANTHEY RD. LATHROP Jul 12 2019 <br /> General Requirements for SPCC Plans <br /> 626 CFR 1121(h)(1) Load inglunl deal ng rack containment system not adequateto contain spill .V .R .COS <br /> 627 CFR 1121(h)(2) Failed to provide vehicular departure system for loading and unloading racks .V .R .COS <br /> 628 CFR 112.7ni , Farure to include in me Plan discussion of conformance with Federal and State requirements n q oCOS <br /> 112.]6) <br /> a29 CFR 112](1) Failed to evaluate field constructed container for brittle fracture and take appropriate action q q oCOS <br /> M CFR 112](k) Failure to provide general secondary containment or alternative for oil-filled operational equipment q q oCOS <br /> SPCC Plan Requirements for Onshore Facilities(excluding production facilities) <br /> 701 CFR 112.8(b)(1) Failureto ensure drainagefrom tllketl areas is restrained by valves or alternative method .V .R .COS <br /> 702 CFR 112.8(bN2) Failed to use manual open-and-closed design valves for the drainage of tllketl areas n n nCOS <br /> 703 CFR 112.8(bN3), Failed to desgn facility drainage system from undlked areas to retain In the facility n n nCOS <br /> 112.8(b N4) <br /> 704 CFR 112.8(bN5) Failed to provide had be pumps for more than erre contiorcus Inttmont unt n n nCOS <br /> 705 CFR 112.8di Combined rept compatible with oil mored andlor storage conditions n n nCOS <br /> 706 CFR 112.8di Failed to provide and maintain adequate secondary containment n n nCOS <br /> ]0] CFR 112.8(c)(3) Failure to follow the criteria&thls section while allowing drainage ofuno.maminated rainwater mV n mCOS <br /> 708 CFR 112.8(cN3)(iv) Failed to maintain records of drainage from tllketl areas n V n R n COS <br /> 7O9 CFR 112.8di Failed to provide corrosion protection for papeadly buried tanks n n nCOS <br /> 710 CFR 112.8di Plan failed to adequately discuss procedures to test or aspect each coming for integrity n n nCOS <br /> 711 CFR 112.8di Failed to perform scheduled tank tests or inspections by appropriately qualified perecmtl n n nCOS <br /> 712 CFR 112.8di Faced to test or inspect each cornstalk,for nun based on industry standards n n nCOS <br /> 713 CFR 112.8di Fared to provide effective leakage control from defective Internal heating coils q n nCOS <br /> 714 CFR 112.8di Fared to provide each container wdh a high leve monitoring device n n nCOS <br /> 715 CFR 112.8(cNBNv) Fared to regularly test liquid level sensing devices to ensure proper operation n n nCOS <br /> 716 CFR 112.8di Failed to observe effluent treatment enough to base potential discharge n n nCOS <br /> ]1] CFR 112.8di Failed to promptly correct visible discharges andor remove accumulations of oil In tllketl areas n n nCOS <br /> 718 CFR 112.8di 1) Failetl to locate properly or provide sufficient secon dary contain mentfor m all led than Is containers n n nCOS <br /> 719 CFR 112.8(ill F ailed to take corrective action on b uried pip Ing win an exposed for any reason q q nCOS <br /> ]ZO CFR 112.8(ill Failed to provide corrosion protection for bu ried pip ing n n nCOS <br /> Mr! CFR 112.8(ill Failed to csphlank-Gang a connect on at transfer point an d mark its orign M not in service n n nCOS <br /> M CFR 112.8(ill Failed to design pipe supports to minimize abrasionloorrosion and to allow for exparmioNcanbaction n n nCOS <br /> M CFR 112.8(ill Failed to regularly Inspect aboveground valves,piping,and appurtenances n n nCOS <br /> Me CFR 112.8(ill Failed to conduct integrity and leak testing on buried piping any time It is worked on n n nCOS <br /> 725 CFR 112.8(4)(5) Failed to adequately warn vehicles entering facility to protect piping and other transfer operations .V .R .COS <br /> 726 CFR 1128(c)(8) Plan failed to adequately describe overfill prevention methodsfor each container .V .R .COS <br /> Other Violations <br /> FAaa1a532 Fiffi 9z SM01 09l1Lta19 <br /> EMtSUI R-0fi 1A18 Page 3of5 AEovegaM P.—Stem,A. IF <br /> 1868 E. Hazelton Avenue I Stockton,California 95205 1 T 209 468-34201 F 209 464-0138 1 w .sjcghd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.