My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2800 - Aboveground Petroleum Storage Program
>
PR0538721
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2019 9:13:32 AM
Creation date
7/23/2019 1:53:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0538721
PE
2832
FACILITY_ID
FA0009480
FACILITY_NAME
STOCKTON PORT DIST
STREET_NUMBER
2201
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14502004/162030
CURRENT_STATUS
01
SITE_LOCATION
2201 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J O A Q U I N Environmental Health Department <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Faciihy Address: Date: <br /> STOCKTON PORT DIST 2201 W WASHINGTON ST STOCKTON Jul 15 2019 <br /> Qualified Facility-Tier) <br /> 405 OFR 1126m Overall prevention for containers not provided,not described in Plan,or tested <br /> Qualified Facility-Tier 11 <br /> 501 CFR 112 6(a)(1) Tier 11 Qualified Facility Plan not certledbytheownerora PE,asrequired .V .R .COS <br /> 1126(b) <br /> 502 CFR 1126(6)(2) Tier 11 Qualified Facility Plan technical amendment not comfort by the owner or a PE oV TR o005 <br /> 503 CFR 112(1, Failure b have a PE cr ify In writing stronger,measures for a Tier 11 Qualified Facility o V o R o COS <br /> 1126(6)(4) <br /> 504 OFR 112 Sutphin Failure of owner to assure that a PE makes all required attestations In a Tier 11 Plan oV TO .COS <br /> ,Gene-a eq ' .SCG <br /> 601 CFR 1127 Failure of Plan ro fulfill basic requirements including a cross-referencing section oV oR .COS <br /> 602 CFR 112](0)(2) Plan failed t0 discuss equivalent environmental protection,if applicable .V .R .COS <br /> 603 CFR 112](0)(3) Failed to adequately ordered the physical layout of the facility in the Plan .V .R .COS <br /> 604 OFR 112.7(a)(3)(p Plan failed to In Gude oil type and storage capacity for each container o V o R o COS <br /> 605 CFR 1123(a)(3)(f) Plan failed to adequately discuss discharge prevention measures including routine handling .V .R .COS <br /> 606 CFR 112.7(a)(3)(th Plan failed to adequately discuss reality drainage or drainage controls o o oCOS <br /> 607 CFR 1127(a)(3)(w) Plan failed to include countermeasures for discharge discovery,response and cleanup .V .R .COS <br /> 608 CFR 112,7(a)(3)(v) Plan failed to address disposal methods for recovered materials D o oCOS <br /> 609 CFR 1127(a)(3vi), Plan failed to adequately contain procedures for reporting a discharge E .R .COS <br /> 112](.4) <br /> 610 CFR 1127(a)(5) Discharge procedures are not adequately addressed if the facility has no response plan _.V .R .COS <br /> 611 OFR 112 7S) Plan failed to include a description of potential equipment failure or proude equivalence _V .R .COS <br /> 612 CFR 1127(c) Plan failed to include satnndary containment diversionary structures,or equip to prevent discharge _V .R .005 <br /> 613 CFR 112 Oc) Failure to proxies appropriate Secondary,containment,diversionary structures or equipment .V .R .005 <br /> 614 OFR 1127d) PE certified Plan failed to explain impracticability of tnntainmentfdiversionary structures .V .R .COS <br /> 615 CFR 1127(d) Failure to perform integrity and leak testing when claiming secondary containment imprompubility cV .R .COS <br /> 616 CFR 1127(d)(1) Failure to prepare an oil spill contingency plan when claiming lmpractcalmon,of structures .V .R .COS <br /> 617 CFR 112 7(d)(2) No written commitment of manpower,equipment and materials to control and remove oil discharge .V .R .COS <br /> 618 CFR 1127(¢),11281c) Failed to keep records of procedures,inspections,or Integrity tests for three years .V .R COS <br /> (6) <br /> 619 OFR 1127(ph) Failed to Vain personnel on all discharge prevention details listed in this section .V .R .COS <br /> 62D CFR 11270(2) Failed to designate a parson accountable for discharge prevention o .R .COS <br /> 621 CFR 112 7(0(1) Failure to include in the SPCC Plan an adequate desorption of employee training eV .R .COS <br /> 622 CFR 11270(3) Failure to conduct complete annual discharge prevention briefings for oil-handling personnel .V oR .COS <br /> 623 CFR 1127(9) Plan failed to address security of site and valves,lock of out and lighting eV o .COS <br /> 524 CFR 1127(g) Faaliry failed to Implement security of site and valves.lock oubtag out and lighting c oR .COS <br /> 625 CFR 1127(h) Plan failed to adequately discuss facility dank bar and tank truck loading/unloading rack .V .R .COS <br /> Fuma46D PRO536721 SCW1 07/152019 <br /> ERn2BA1 Rer,.OM112DIB Page 2of5 Fbovegrcund Petroleum storage cut OR <br /> 1868 E Hazelton Avenue I Stockton,California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.slcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.