My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012683
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
3500 - Local Oversight Program
>
PR0544687
>
ARCHIVED REPORTS XR0012683
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 9:02:15 AM
Creation date
7/24/2019 8:17:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012683
RECORD_ID
PR0544687
PE
3528
FACILITY_ID
FA0006185
FACILITY_NAME
El Dorado Gas & Mart
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
02
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�f <br /> PRE-TAMC SITE ASSESSMT 1AR19LAN <br /> 1305 S. El Dorado, Stockton, CA <br /> Aegis Project No. 90-205 <br /> Pape 2 <br /> SITE DESCRIPTION <br /> r- <br /> The Exxon service station located at 1605 South E1 Dorado in the <br /> City of Stockton, San Joaquin County, California is presently an <br /> active station. The store retails regular-leaded, regular-unleaded <br /> and super-unleaded gasolines. The station facilities include a <br /> building, three dispenser islands and three UST's with associated <br /> product piping. The three UST's are located immediately south of <br /> the dispenser islands on the southern half of the site, see Figura <br /> 2. The type of construction and the installation dates of <br /> UST's are unknown. the <br /> SITE BACKGROUND AND BYDROGEOLOGY <br /> Exxon proposes to remove the existing tanks and associated <br /> 000 product <br /> piping and replace with three 12 <br /> and product piping. gallon tanks, new dispensers <br /> pip g. To date, Aegis is unaware of any former <br /> environmental investigations performed at the site. <br /> �._ Groundwater flow direction has not been determined at the site, but <br /> local investigations have identified the groundwater surface to be <br /> at a depth of approximately 60 feet below ground surface (bgs) . <br /> SITE PLAN <br /> For the purposes of this workplan, a project site plan map is <br /> r included as Figure 2. The layout includes the location of the <br /> three existing UST's, dispenser islands and product lines. The <br /> proposed two on-site soil borings locations are also included in <br /> f;.. Figure 2. <br /> BITE SAFETY PLAN <br /> A Site Safety Plan (SSP) prepared <br /> during all field activities. All On-site work be co <br /> will ill n on site <br /> conon <br /> in <br /> accordance with the SSP. A copy of the SSP is included as Appendix <br /> A. The SSP contains information on the properties of the hazardous <br /> materials known to be on site. This information is equivalent to <br /> that contained within the Material Safety Data Sheets. <br /> BOIL BORING AND SOIL SAMPLING <br /> Prior to drilling, a Ground Penetrating Radar Survey (GFR) will be <br /> performed to identify detectable subsurface _utilities and-possible-- -— <br /> ----drilling-obstructions-that may be buried at or near each boring. <br /> location. The GPR will also assist in delineating the exact <br /> boundaries of the UST's. As drilling is not proposed near the site <br /> 4 <br /> �.: 90-205A.YPM <br /> 90.205.WP <br />
The URL can be used to link to this page
Your browser does not support the video tag.