Laserfiche WebLink
FIELD INVESTIGATION TEAM <br /> SITE HEALTH AND SAFETY PLAN <br /> F <br /> A._GENERAI NFA ON <br /> j -. <br /> Aegis Project Number: 90^205 <br /> Client: Exxon Company, U.S.A. g <br /> !.: <br /> Site Name: Exxon South E15Dor7do137 <br /> .� Client Project Number: RA # Stockton, California <br /> Street Address: 1605 S. El Dorado, Date: January 17, 1991 <br /> Plan Prepared by: REK <br /> !'� Date: January 16, 1991 <br /> Approved by: JARD <br /> Date: <br /> ,,.. Revised by: <br /> Date: <br /> raved by: <br /> Prevision App any) <br /> of petroleum <br /> objectives; Phase I Aetermine exten dr lling, sampling and <br /> ta; hydrocarbons in soil by <br /> analytical testing. <br /> 1991, pending permitting <br /> Proposed date of investigation: February,proval x <br /> Hazard Summary/Level of Protection <br /> a.: B• C• D.��(with modifications} ; <br /> A:�- <br /> 4 <br /> ff <br /> t <br /> IW. <br /> 1.. <br />