Laserfiche WebLink
gm011 14, m <br /> f <br /> t� D. SITE SAFE WOR LAN <br /> E <br /> r <br /> PERSONNEL <br /> Team Member Title Responsibility <br /> ` Robert E. Kimmerling Project Engineer Site Coordinator <br /> Jacqueline R. Doub Project Engineer Project Manager/ <br /> Site Safety Officer <br /> i <br /> Pat Wright Senior Geologist Senior Review/ <br /> !� Project oversight <br /> PERIMETER ESTABLISHED <br /> Map/Sketch Attached? Yes XX No <br /> Site Secured? Yes . No XX <br /> Perimeter Identified? Yes No XX <br /> �.r Contamination zones identified? line defined.? Yes No XX <br /> Free Product? Yes No <br /> Dissolved Product? Yes No <br /> INVESTIGA'T'ION-DERIVED MATERIAL DISPOSAL: <br /> ✓ Soil from investigative activities will be stockpiled and .stored <br /> temporarily on-site until analyses are available to describe the <br /> levels of petroleum hydrocarbon and lead constituents contained in <br /> { " them. Soil stockpiled on site will be placed on and covered by <br /> plastic sheeting. Any material disposed off-site will be disposed ' <br /> of in accordance with existing regulations and guidelines. ' <br /> rT <br /> y <br /> E <br /> E <br /> .LW - ... <br /> f , <br /> i <br />