Laserfiche WebLink
s <br /> Fr <br /> `t <br /> QUARnmLY GnouNDWATEA motif rMNG PEP= <br /> 1605 Louth EI Aorada,StccKon,Callfornla - <br /> 1.0 INTRODUCTION <br /> 1" This report documents the results of the first quarterly groundwater monitoring conducted <br /> by Aegis Environmental,Inc. (Aegis),on October 17, 1991,at the Exxon Company. U.S.A. <br /> (Exxon),service station located at 1605 South EI Dorado In Stockton, California(Figure 1). <br /> The monitoring included collection of depth-to-groundwater measurements and water <br /> samples from the three wells, MW-1, MW-2, and MW-3, located on site (Figure 2). This <br /> report is based, in part, on information obtained by Aegis from Exxon, and is subject to <br /> modification as newly acquired inforrna6cin may warrant. <br /> rig <br /> 2.0 SITE DESCRIPTION <br /> i a <br /> The subject site is located between South EI Dorado Avenue and Center Street in the City <br /> i of Stockton, San Joaquin County, California (Figure 1). The site is situated in a <br /> 6� commercial/residential/light industrial area of southern Stockton. The site is bound on <br /> the north by East 2nd Street, on the east by South El Dorado Avenue, on the south by <br /> a car wash facility, and on the west by Center Street. <br /> l ; The Exxon service station is presently an active station. The store retails regular-leaded, <br /> regular-unleaded, and extra-unleaded gasolines. The station facilities include a building, <br /> three dispenser islands, and three underground storage tanks (UST) with associated <br /> product piping. The three UST are located immediately south of the dispenser islands <br /> on the southern half of th site. The type of construction and the installation dates of the <br /> UST are unknown. Figure 2 shows the location of the site's above-ground and <br /> i underground features. <br /> t <br /> ( »: 3.0 BACKGROUND <br /> On February 5, 1991, a ground penetrating radar (GPR) survey was performed by <br /> NORCAI_ Geophysical Consultants, Inc., of Petaluma, California. The survey was <br /> performed in the area of the existing UST basin to locate existing underground facilities <br /> -! for avoidance during drilling. Upon completion of the GPR survey, two soil borings were <br /> drilled on February 22, 1990, at an angle of 30 degrees from vertical, adjacent to the <br /> .j existing.UST basin (Figure 2). The borings were advanced Using an 8-inch-diameter <br /> hollow-stern auger. A total of 60 feet of auger was utilized in each boring, with a final <br /> sample drive of 18 inches achieving a total depth of 61.5 feet along the 30-degree angle. <br /> The actual vertical depth penetrated by the borings was approximately 53 feet below <br /> existing grade. Soil samples collected from the two soil borings were analyzed for total <br /> r petroleum hydrocarbons (TPH), as gasoline, benzene, toluene, athylbenzene, total <br /> I l xylenes(BTEX),ethylene dibromide,1,2-dichloroethane,and total lead. Results of the soil <br /> _ boring and sampling were reported by Aegis to Exxon, in a"Pre-Tank Replacement Site <br /> - -- s - Assessment-Results-Report, dated March-5;-1991 --- -------- - ---------- <br /> tl �i 9t-044CAPT <br />