My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012683
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
3500 - Local Oversight Program
>
PR0544687
>
ARCHIVED REPORTS XR0012683
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 9:02:15 AM
Creation date
7/24/2019 8:17:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012683
RECORD_ID
PR0544687
PE
3528
FACILITY_ID
FA0006185
FACILITY_NAME
El Dorado Gas & Mart
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
02
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r 1, l Si <br /> Az <br /> r� <br /> AEGIS ENVIRONMENTAL, INC. <br /> STANDARD OPERATING PROCEDURE <br /> RIE: HOLLOW-STEM AUGER MONITORING WELL INSTALLATION AND <br /> DEVELOPMENT <br /> SOP-l3 <br /> Boreholes for monitoring wells are drilled using a truck-mounted, hollow-stem auger drill <br /> rig. The borehole diameter will be a minimum of 4 inches larger than the outside diameter <br /> of the casing when installing well screen. The hollow-stem auger provides minimal <br /> interruption of drilling while permitting soil sampling at desired intervals. Soil samples are <br /> collected by either hammering or hydraulically pushing a conventional split-barrel sampler <br /> containing pre-cleaned 2-inch-diameter brass tubes. A geologist or engineer from Aegis <br /> Environmental,Inc.,continuously logs each borehole during drilling and constantly checks <br /> drill cuttings for indications of both the first recognizable occurrence of groundwater and <br /> volatile hydrocarbons using either a portable photoionization detector, flame ionization <br /> detector, or an exptosimeter. The sampler is rinsed between samples and either steam <br /> cleaned or washed with all other drilling equipment between borings to minimize the <br /> potential for cross-contamination. <br /> i <br /> Monitoring wells are cased with threaded,far..ory-perforated and blank Schedule 40 PVC. <br /> i The perforated interval consists of slotted casing, generally with 0.020-inch wide by <br /> _ 1.5-inch long slots, with 42 slots per foot. A PVC cap may be secured to the bottom of <br /> the casing with stainless steel screws; no solvents or cements are used. Centering <br /> devices may be fastened to the casing to ensure even distribution of filter material and <br /> grout within the borehole annulus. The well casing is thoroughly washed and/or steam <br /> f cleaned, or may be purchased as pre-cleaned, prior to installation. <br /> After setting the casing inside the hollow-stem auger, sand or gravel filter material is <br /> poured into the annular space to fill from boring bottom to generally 1 foot above the <br /> perforated interval. A 1- to 2-foot thick bentonite plug is set above this filter material to <br /> prevent grout from infiltrating into the filter pack. Either neat cement, containing about <br /> 5 percent bentonite,or sand-cement grout is then tremmied into the annular space from <br /> the top of the bentonite plug to near surface. A traffic-rated vault is installed around each <br /> wellhead for wells located in parking lots or driveways,while steel"stovepipes"are usually <br /> set over wellheads in landscaped areas. <br /> After installation,the wells are thoroughly developed to remove residual drilling materials <br /> from the wellbore, and to improve well performance by removing fine material from the <br /> filter pack that may pass into the well. Well development techniques used may include <br /> pumping, surging, bailing, swabbing, Jett'rng, flushing, and air-lifting. All development <br /> water is collected either In drums or tanks for temporary storage, and properly disposed <br /> of depending on laboratory analytical results. To minimize the potential for cross- <br /> contamination between wells, all development equipment are either steam cleaned or <br /> properly washed prior to use_ <br /> ATTACHMENT/SCP-6jSEVMMBER 1992 <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.