My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012683
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
3500 - Local Oversight Program
>
PR0544687
>
ARCHIVED REPORTS XR0012683
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 9:02:15 AM
Creation date
7/24/2019 8:17:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012683
RECORD_ID
PR0544687
PE
3528
FACILITY_ID
FA0006185
FACILITY_NAME
El Dorado Gas & Mart
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
02
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w _ <br /> R <br /> r <br /> d <br /> i <br /> i <br /> e ..- <br /> AEGIS ENVIRONMENTAL, INC. <br /> STANDARV OPERATING PROCEDURE <br /> wNG LiGIUI©1-EVES USING WATER LEVEL OR INTERFACE PROBE <br /> RE: MEASUR- <br /> SOP-'12 <br /> ' icall Or <br /> the measuring probe <br /> 5 The Meld kit also includes <br /> Field equipment used for liquid-Ievei gauging tyR y <br /> (water-level Or inteiface), light filter(s), and product baller{s). <br /> supplies {buckets, TSP, spray bottles, and deionized water) to be used in <br /> cleaning pp <br /> cleaning the equipment between wells. <br /> is lowered into the well until if touches bottom. sthe <br /> Prior to measurement,the probe tip i e Wellhead vault) <br /> the reviausiy established top-of-casing or top-at-box ((graduated in hundredths of a <br /> R <br /> _ probe cord (Or halyard) is marked and a measuring tape g and the <br /> used to determine the distance between ethe U robe ed� sheet asthe "depth to <br /> foot) <br /> This measurement is then recorded on tri q <br /> i water (DTW). robe is first electrically <br /> the p <br /> When no ground <br /> When using the interface probe to measure ther�metaa)Is <br /> ohle cinearby.trie ground lead to <br /> grounded to either the metal <br /> Is pip the probe. the top of the well <br /> is available, reproducible measurements Aft be ounding the clipping with the operation <br /> the handle of the interface probe Case and <br /> �. . casing is fitted with a light filter to insure heat sunlight t A se then lowerred int Otthe wi is n <br /> of the probe's optical mechanisms. probe tone indicates t probe <br /> submerged in the groundwater. An Oscillating (beeping) tone ceases or becomes a <br /> TW <br /> water. The probe is slowly raisedeh stili i the the <br /> oscillating <br /> indicator d�ocarbanthe Q <br /> steady tons. In either Cas 1 The steady tone indicates floating y th-to- <br /> measurement is made accordingly. tone Ceases- <br /> this <br /> is the dep <br /> i this case, the probe is slowly raised until the steady <br /> product (DTP) <br /> indicator and the DTP measurement is mads accordingly. <br /> robe must be repeated several times to ensure <br /> The process of lowering and raising the p probe's response, a proc!Jct <br /> S <br /> meng The ()TW and DTP measurements o e recorded on the liquid <br /> accurate measure roduct is Indicated by t P prod on <br /> level data sheat. When floating p articularly,,'•n cases <br /> bailer is lowered partially through the ps of araduct thickness, <br /> ter in <br /> confirm the p sheet <br /> the water surface, and as further indication s <br /> where the product layer is quite thin. This measurement is recorded on the;rJata <br /> as "product thickness." <br /> • ontamination of wells during the liquid-level r,ieasurement <br /> In order to avoid cross C <br /> " where such`information is <br /> process, wells are measured in the order Of"clean"to "dirty <br /> — ment is cleaned — �i solution and <br /> Ila V3 . In-addition.-allm.easurementfoegeuuse-between-measuremen s in resile ive <br /> ova ) rinsed with delonized water ba <br /> thoroughly completion of the day's use. r' <br /> ri wells, and at the <br /> 1 <br /> J_l - 121JUNE199Y <br /> � _ 1 _ <br /> ATTACHMENTIS '. <br /> '¢1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.