My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0008631
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
3500 - Local Oversight Program
>
PR0544687
>
ARCHIVED REPORTS XR0008631
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 8:47:34 AM
Creation date
7/24/2019 8:28:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008631
RECORD_ID
PR0544687
PE
3528
FACILITY_ID
FA0006185
FACILITY_NAME
El Dorado Gas & Mart
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
02
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMBUSTION CYLM-BER: <br /> The horizontal fired, rectangular shaped combustion chamber is <br />' constructed of carbon steel, externally painted with a coating <br /> suitable for continuous exposure to normal at=cspheric conditions. <br /> The combustion chamber is lined with a refractory material rated <br /> for use to 2400° F. r <br /> our equipment, all components of the <br /> To simplify the handling of <br /> base Q�QR cE~cm system are mounted on an i beam type skid_ The <br /> snub stack is cons:tiered part cf she combustion chamber and is <br /> pe=�anently fixed to the combustion c::amber and the skid. There is <br /> at least one (1) IS" X IB" manway to facilhate access for ease of <br /> inspection and maintenance. <br /> B IIPN---R <br /> Incorporating the latest in technology, our burners will hpsical <br /> equally well on natural gas cr propane without ma3ti nc, any P Y <br /> modif-, cations. The burner modulates both the fuel and necessary <br /> 1 combustion air at a turndown rate of at least 20 to 1. The burner <br /> -nodula tes respond-nc to the FTU value of rate to your process <br /> strear. In other wcrds, the richer vou+ process st=eam, the less <br /> 1 purchased f ael that is rewired. <br /> The gas t_zin is pined per FM specifications are <br /> availacwe at an acditional charge. <br /> HZXT RECOVERY: <br /> 1 we can sun- designed c�us tam designed neat exchanger to camPlimen' your <br /> et=ofitted at a <br /> ecru=a:ie If p=e=ewred, the exchanger car. be = <br /> later date due to aur unimae utilization of a commcn flange. <br /> 1 traded of high alloy steels and are <br /> All o f our exchangers are cons�_.... <br /> ;cell adapted to the elevated temaera� ! d n°_by aconcerns <br /> ppe icaticn. <br /> 1 that must be addr-essed ind-vidua-_y, p- <br /> ica <br /> STAcRs : <br /> 1 The flanged top of the snub stack is fim <br /> tted with cur common flange; <br /> }here f cre you can add stack sections as _eq:_red. We produce them <br /> y t and ten ( ) foot <br /> for our standard un-Its in five (5} f ao%. IO <br /> increme:ts. All of our stacks are refrac tart' lined with a material <br /> 1 capable of withstanding at least 2400' F. <br /> Reasons:le height stacks can be made self suaPcr'ting; however, the <br /> 1 y � + <br /> VAPOR C� CF. is so light in weight tha= we recommend you guy wire, �o <br /> insure s tab i l itv.. <br /> NOTE: Before adding stack sections to the tap of :feat Exchangers - <br /> CoNSULT factory for written recommendations- <br /> 1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.