Laserfiche WebLink
I <br /> ER�re��r,g,tn� GROUNDWATER PURGE AND SAMPLE <br /> Project Name Exxon 7-0137 Well No 14, 1,U _ S Date 7� s� t5 <br /> Project No UP0137 1 Personnel (� <br /> ' GAUGING DATA <br /> Water Level Measuring Method Measuring Point Description TOC <br /> ' `Total De th'i r 'D , r� � , z �,� <br /> p ep#h to Water. WatertCo}umn �Multtpller,fo"r CasingVolurxie ,Total Pur�e� <br /> WELL,�PURGE _ti _ - r;d- a - ro ti - rx , <br /> VOLtJM (feet) k =£'(feyet)* yq !Casing`Dlameter n l it{gal} �= 'v-Volume <br /> CALCULATION _ 4 <br /> 7 6 _ <br /> l% z X S <br /> ��' 004 016 064 144 �� <br /> PURGING DATA <br /> Purge Method Submersible Pump Purge Depth Screen Purge Rate (gpm) <br /> Time <br /> Volume Purge(gal) 7` Lam` <br /> ' Temperature(C) <br /> pH <br /> ' Spec Cond (umhos) <br /> TurbiditylColor <br /> Odor(YIN) 1 <br /> ' Casing Volumes } <br /> Dewatered(YIN) <br /> ' CommentslObservbatlons <br /> ' SAMPLING DATA <br /> Time Sampled s t J Approximate Depth to Water During Sampling (fee!) <br /> 1 Comments <br /> Sample Number Number of Container Type Perservative Volume Filled Turbidity/ Color Analysis <br /> Containers (mL or Q Method <br /> (p Voa HCL 40 ml TPH s 6T1 X MTEE <br /> FEE <br /> Total Purge Volume (gallons) Disposal <br /> Weather Conditions n <br /> Condition of Well Box and Casing at Time of Sampling <br /> Well Head Conditions Requiring Correction <br /> Problems Encountered During Purging and Sampling <br /> ' Comments <br /> r•a«, <,ri,orl1 u,uc s,irttn,s/1��r,.ti Jo, r�u,,,,r <br />