My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EMBARCADERO
>
6649
>
2300 - Underground Storage Tank Program
>
PR0231098
>
COMPLIANCE INFO 2012 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2020 4:45:55 PM
Creation date
7/24/2019 9:18:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012 - 2018
RECORD_ID
PR0231098
PE
2361
FACILITY_ID
FA0003830
FACILITY_NAME
VILLAGE WEST MARINA
STREET_NUMBER
6649
STREET_NAME
EMBARCADERO
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
09815006
CURRENT_STATUS
01
SITE_LOCATION
6649 EMBARCADERO DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
388
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Village West Marina, 6649 Embarcadero Dr, Stockton, CA <br />- Designated Underground Storage Tank (UST) Operator <br />Monthly Visual Inspection Checklist <br />Facility 1Vame: VILLAGE WEST MARINA Date: <br />Facility Address: 6649 EMBARCADERO DRIVE <br />City: STOCKTON Zip Code: 95219 <br />Designated UST Operator Conducting the Inspection: GREG KAISER <br />International Codeci itification 9: 5252318 tix station Date: 10/15[2015 <br />Sienature: �' Photic: 209 ) 887-2639 <br />Y = Ytv. N = No, tit, = Not APplteaRle <br />Item I /MONITORING PANEL / ALARM HiSTORY I v I N 1 1-4' <br />1 \Tonitorine <br />system is powered on and in proper operating mode. <br />t9onitorin� system is not currently showing any alarms or warnings. <br />3 Alamt history report/log for the previous month is available, and has been reviewed by the ><I <br />Designated UST O orator. (Attach a co of the alarm histol re ort/lo to this• form if available.) <br />4 Each ularm for the previous month has been responded to appropriately. <br />X <br />5 Sensors located in tank -top containment sumps have not alarmed in the past month. v I <br />Sa List all tank -top sumps where alarms occurred in the past month: <br />Note. S+mtps where art alarm has occurred in the past month must be inspected tmless a qualified service technician responded to. aril <br />property addressed the cause of the alarm. Attach documentation verifying appropriate service to this report. <br />lf.sunrn insnecrion is reouired. record results in item 6, below. <br />UST SYSTEM INSPECTION <br />6 Tank -top containment sumps are free of water, debris, and hazardous substance. Sensors arc located properly. <br />Ir N'or visual inspection of sumps is only required in sum s where an alarm has Occurred tit the past month for xduch there is no wmca <br />I 1 T: N <br />Stun Location: <br />Sump Location: <br />Sum Location: <br />Sump Location: <br />Sun? Location: <br />Sinn Location: <br />7 S ill containment structures are free of water, debris, and hazardous substance. <br />N <br />a, <br />N NA <br />�— <br />Tank 1 - Conten". <br />Tank 3 - Contents: <br />Tank 2 - Contents: <br />I <br />Tank 4 - Contents: <br />water, debris, and hazardous substance. Sensors are located <br />- <br />rk) ccl y <br />8 Under-dis enser containment area,; are <br />e of <br />a <br />Y N NA <br />- <br />Dis enser 3 / l <br />Dispenser 30 / 31 <br />l Dis censer 715 ,� <br />Dis enser 3 7 / 3 5 _ — <br />Disunser 23 i ?I j <br />Dis enser <br />- <br />Disenser?7/ 25 <br />— <br />Dispenser <br />PAPERWORK INSPECTION Y N NA DANL DOIVr. <br />9 Monitoring system certification has been cornleted within est 12 months. X <br />10 Secondary containment tests have been completed within the ret tired umelrante. - <br />1 1 Spill containment structure (bucket) testing was completed within the past car, - <br />12 Tank tightfiess.testlflg was completed within required timeframe. <br />13 1 Line tightness testing was completed within required timeframe. <br />December 2014 monthly D.O report with correct secondary containment test date <br />Page 18 of 28 Photo taken on March 16, 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.