Laserfiche WebLink
SWRCB,January 2002 Page of' <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run# Piping Rwi# <br /> Piping Material: Fiberglass&Poly Fiberglass&Poly <br /> Piping Manufacturer: Ameron&APT Ameron&APT <br /> Piping Diameter: 3"Ameron/1 %z"APT 3"Ameron/1 ''/z"APT <br /> Length of Piping Run: 215'combined 195' combined <br /> Product Stored: Super 91 Red Diesel <br /> Method and location of Test boot at STP Test boot at STP <br /> piping-run isolation: Piping Sump#1 Piping Sump#2 <br /> Wait time between applying 5 Minutes 5 Minutes <br /> pressure and statting test: <br /> Test Start Time: 9:40 9:50 <br /> Initial Reading(RI): 5 Psi 5 Psi <br /> Test End Time: 10:40 10:50 <br /> Final Reading(RF): 5 Psi 5 Psi <br /> Test Duration: 1 Hour 1 Hour <br /> Change in Reading(RF-Ri): 0 Psi 0 Psi <br /> Pass/Fail Threshold or No detectable loss No detectable loss <br /> Criteria: <br /> Test Result: Pass Pass <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Note: Crossovers connected at transition piping sumps for testing. Crossovers removed at end of testing. <br /> All test boots open at conclusion of testing to allow earliest detection of a primary pipe leak. <br />