Laserfiche WebLink
8. a. De tribe the method that will be utilized to purge andlor inert the tank(s): <br /> d rn.l P� 1 <br /> b. TanklPiping Haul c--� <br /> Name (4L <br /> Address �2a / L�.�L« - clty=^SY t zip <br /> Phone No4n2r4 <br /> Hauler Registration # Of hauled as hazardous) /� <br /> C, TanklPlpin Disposal Site: <br /> Name_� L <br /> Address j2. ,A& l�tyLr� L C/ Lla _ City 7/ C ZIP <br /> Phone Nolte <br /> EPA ID# (it transported to a permitted TSD facility)—Ar�i j <br /> 9. Is the sampling firm an Independent third party from the contractor? YES �0 [ ] <br /> 9a. Describe, In detaiL hhow" the soil or water sampi s) beneath the tank and pi ng wDl be obtained <br /> �T L�t6c � k (L =La <br /> i <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> y A V ] <br /> 11. Handling of excavated soil: <br /> a) What material will be used to line the tank pit and cover the stockpile? <br /> b) What will be the final destination of the excavated stockpile? <br /> � .46 <br /> � u�uV <br /> c) Contaminated SoilHazazdo aste Hauler. <br /> Name Hauler Registration # <br /> Address �5 Pf��� 6'LV� City R 1 c t-t IVLCA > zip <br /> Phone No. ( <br /> EH 23 096 (Revised 10119198) Page 5 <br /> I� <br />