Laserfiche WebLink
STOCK v UH SERVICE �a IN <br /> STAMN EQUPMENT 0009 INCO <br /> CAL, LIC , 309105-A-C61 / D40 HAZ <br /> 808 N . UNION ST, STOCKTON, CALIF. 95205 <br /> P.O. BOX 508 STOCKTON , CALIF. 95201 <br /> PHONE 209 /464-8333 FAX 209/464-8349 <br /> TAX LD. #94-1573741 <br /> SALES SERVICE ® INSTALLATION OF PETROLEUM DISPENSING ® LUBRICATION & INDUSTRIAL SERVICE EQUIPMENT <br /> SITE SAFETY PLAN <br /> September 8, 1999 <br /> Quick and Save <br /> 1901 & El Dorado Street <br /> Stockton, CA 95206 <br /> For Tank Removal : one 10,000, one 4,000, one 4,000 and one 2,000 gallon UGST. <br /> The Project Manager and Health & Safety coordinator is: Mike Flores of Stockton Service <br /> Station Equipment Co. Inc., 808 N. Union Street, Stockton, CA 95205 . Phone 209-464-8333 . <br /> The Alternate Site Safety Officer is : Randy Chadwick or Mike Jones of Stockton Service <br /> Station Equipment Co. Inc . <br /> Stockton Service Station Equipment Co. Inc., will have on site two (2) fire extinguishers and one first aid <br /> kit within 50 feet of the tank area where flammable vapors are present. Stockton Service Station <br /> Equipment Co. Inc. shall notify the local fire department and U.S.A. dig 48 hours before excavation shall <br /> begin. The tanks will be emptied of product before start of job. The tanks will be triple rinsed and dry iced <br /> (30 lbs. Per 1000 gallons) before lifting tanks. Stockton Service Station Equipment Co. Inc. shall monitor <br /> tanks with a Low Explosion Level (LEL) meter. <br /> We will seal all openings and one plug will have 1/8" openings, before tanks will be transported, along with <br /> piping. At no time will Stockton Service Station Equipment Co. Inc. cut or weld on site. <br /> The tanks will be secured on truck after excavation for transportation, tanks and plumbing will be hauled <br /> away by Cal-Coast Equipment, 700 N. Walnut, Turlock, CA 95380, (209) 668-9378. <br /> Stockton Service Station Equipment Co. Inc. will approach all excavations with possible cave-ins. The <br /> following rules will be followed to prevent any mishap. <br /> 1 . Soil will be inspected for stability before and after removal. <br /> 2. Soil to be at least two (2) feet from edge of excavation. <br /> 3 . If excavation is five (5) feet or more, the hole shall be tapered, braced or other equipment methods <br /> will be used to prevent possible cave-ins. Precautions will be implemented at all times. <br /> On the job site, clean fill will be used to backfill the empty hole, after soil samples have been taken by <br /> Advanced GeoEnviroomental, Inc., 4005 N. Wilson Way, Stockton, CA 952053 (209) 467-1006. <br /> Soil samples will be excavated using a backhoe. Samples will be taken two (2) feet to four (4) feet at the <br /> tank bottom by hand, using brass tubes. All of the above procedures will be according to code. Any part <br /> not backfilled, shall be barricaded and caution tape will be used <br /> I <br /> I <br />