My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1901
>
3500 - Local Oversight Program
>
PR0544688
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 9:39:44 AM
Creation date
7/24/2019 9:31:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544688
PE
3526
FACILITY_ID
FA0001946
FACILITY_NAME
El Dorado Food Mart
STREET_NUMBER
1901
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16508019
CURRENT_STATUS
02
SITE_LOCATION
1901 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Facility Name: (Page 3) <br /> f In-Tank Gauging / SIR Equipment: <br /> ®Check this box if tank gauging is used only for inventory control . <br /> ❑Check this box if no lank gauging or SIR equipment is installed and disregard the following section. <br /> Com tete the fe)Iowin checklist: <br /> ® Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? - <br /> Yes ❑ No* Were all tank-gauging probes visually inspected for damage and residue buildup? <br /> i <br /> ® Yes ❑ No* Was accuracy of system product level readings tested? <br /> ® Yes ElNo* Was accuracy of system water level readings tested? <br /> ® Yes ❑ No* Were all probes reinstalled property? <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): <br /> ❑ Check this box if LLDs are not installed and disregard the following section. <br /> PE] yes <br /> JN * <br /> r equipment start-up orannual equipment certification, was a leak simulated to verify LLD performance? <br /> heck all that apply) Simulated leak rate: ® 3 g.p.h.; ❑ 0. 1 g.p.h ; ❑ 0.2 g.p.h. <br /> ere all LLDs confirmed operational and accurate within regulatory requirements? <br /> as the testing apparatus properly calibrated? <br /> r mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> El Yes ElNo* For electronic LLDs, does the turbine automatically shut off ifthe LLD detects a leak? <br /> ® N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ® N/A or disconnected? <br /> E] Yes El No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> ® N/A malfunctions or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> ® N/A <br /> ® Ycs ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H , below, describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.