My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1901
>
3500 - Local Oversight Program
>
PR0544688
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 9:39:44 AM
Creation date
7/24/2019 9:31:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544688
PE
3526
FACILITY_ID
FA0001946
FACILITY_NAME
El Dorado Food Mart
STREET_NUMBER
1901
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16508019
CURRENT_STATUS
02
SITE_LOCATION
1901 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I , <br /> SWRCB. January 2002 <br /> Page 2 of 7 <br /> Quick N ' Save/Sohol Market <br /> 4. TANK ANNULAR TESTING <br /> 'fest Method Developed By: [ ] Tank Manufacturer [X ] Industry Standard [ ] Professional Engineer <br /> [ ] Other (Specify) <br /> Test Method Used: [ ] Pressure - [X ] Vacuum [ ] Hydrostatic <br /> [ ] Other (Specify) <br /> Test Equipment Used: Vacuum Ga e Equi ment Resolution: 0. 25 H <br /> Tank # 1 Tank # Tank# Tank # <br /> Is Tank Exempt From [ I Yes [ X] No [ ] Yes [ ] No [ ] Yes [ ] No [ ] Yes ( ] No <br /> Testing? I <br /> Tank Capacity: 3,000/105000 <br /> Tank Material: <br /> Tank Manufacturer: Elutron <br /> Product Stored: Regular/Super Unlead <br /> Wait time between applying <br /> pressure/vacuum/water and 5 Minutes <br /> starting test: <br /> Test Start Time: 8 : 15 A.M. <br /> Initial Reading (Rl): 10 H <br /> Test End Time: 9: 15 A.M. <br /> Final Reading <br /> Test Duration: One Hour <br /> Chane in Reading Rf Rl -0- <br /> Pass/Fail Threshold or -0- <br /> Criteria: <br /> Test Result: [X] PASS 1 I FAIL - [ ] PASS[ 1 FAIL [ ] PASS [ 1 FAIL. [ ]:PASS I I FAIL <br /> Was sensor removed for [X] YES [ ] NO [ ]YES [ ] NO [ ] YES [ ] NO [ ] YES [ ] NO <br /> testing? ( 1 N/A [ ] NIA [ ] N/A [ ] N/A <br /> Was sensor properly replaced [X] YES [ ] NO [ ] YES [ ] NO [ ] YES [ ] NO [ ] YES [ ] NO <br /> & verified functional after [ ] N/A [ ] NIA [ ] N/A [ ] N/A <br /> testing? <br /> Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> I Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment, such as systems <br /> that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment testing, (California Code of Regulations, Title 232 <br /> Section 2637(a)(6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.