Laserfiche WebLink
FuJI <br /> Dual Phase Extraction Pilot Study Work Plan t -ll � 0 v L, D) <br /> QUICK N SAVE #1 <br /> 1901 South El Dorado Street, Stockton, California OCT - 6u� 8 <br /> EALTH <br /> TABLE OF CONTENTS E{`IUIRCP110 EIJ I H <br /> f E ,jrJ1it -RViEELCE� <br /> SECTION PAGE <br /> 1 .0. INTRODUCTION, w 0 w 5 a a a 0 0 0 & 0 a * a 6 0 a a 9 a 0 9 0 0 0 0 a a 0 a 0 1 <br /> 2.0. PRINCIPLES OF DUAL-PHASE EXTRACTION. . 0 0 9 9 w 9 9 9 a 9 0 0 0 a a 4 a 0 a a w a * 0 a 1 <br /> 3.0. SCOPE OF WORK. . . . . . . . . . . . . . . . . . R 0 0 0 0 . 0 5 0 . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 <br /> 3 . 1 , PERMITTING AND PRE-FIELD WORKPREPARATIONS. . . . . . . . . . . . . . . . 2 <br /> 3 .2. DPE PILOT STUDY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 <br /> 3 .3 , GROUND WATER SAMPLE COLLECTION AND ANALYSIS. . . . . . . . . . . . 3 <br /> 3 .4. PREPARATION OF REPORT OF FINDINGS , 11 1 1 1 1 1 1 1 1 1 1 . . . . . . . . . . . . . 13 <br /> 4.0. FIELD PROCEDURES. . . 4 w 0 0 Ill 0 w 4 5 5 9 * @Good 00660660 5 0 4 <br /> 4. 1 , DPE SYSTEM DESIGN. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 4. 1 . 1 . Ground Water and Soil Vapor Extraction. . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 4.2 DPE SYSTEM OPERATION AND PILOT STUDY MONITORING. . . . . . . . . . 5 <br /> 4.2. 1 . Field Measurements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 <br /> 4.2.2. Collection and Analysis of Soil Vapor, Extracted Water and <br /> Ground Water Samples" I I I I I I I I I I I ' ll ' ' 1 4 400016 <br /> 4.2.3 . DPE Feasibility Analysis. . I I I I I ' ' I I Ill , 111 1 1111 * 6 <br /> 4.2.4. Equipment and Operational Safety, ' Ill 000 1 111116 <br /> 4.2. 5, Permitting Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> FIGURES <br /> Figure 1 - Location Map <br /> Figure 2 - Site Plan <br /> Figure 3 - Simplified Dual Phase Extraction System Schematics <br /> Figure 4 - Cross Section - Hydrocarbon Impacted Soil <br /> Figure 5 - Extraction Well Design <br /> APPENDICES <br /> Appendix A - Site Background Information <br /> Appendix B - Regulatory Letter <br /> Appendix C - Monitoring and Sampling Procedures <br /> Advanced GeoEnvironmental, Inc. <br />