Laserfiche WebLink
06 October 2008 <br /> AGE-NC Project No. 06- 1457 <br /> Page 7 of 7 <br /> 4.2.5 . Permitting Requirements <br /> Permitting requirements for this interim remediation pilot study will be limited. The proposed <br /> catalytic oxidizer will not require a San Joaquin Valley Unified Air Pollution Control District pilot <br /> study time of five days . <br /> Because the extraction system is portable and temporary, no electrical permits should be required. <br /> A portable generator will be used for electrical service on the site, as the site only has single phase <br /> power. Well connection details are shown in Figure 4. Fluids from the knock out and stinger pipes <br /> will be routed to the holding tank. From the holding tank, wastewater will be pumped as required <br /> and recycled at an authorized facility under waste manifest. <br /> Advanced GeoEnvironmental, Inc. <br />