My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1901
>
3500 - Local Oversight Program
>
PR0544688
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 9:40:37 AM
Creation date
7/24/2019 9:32:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544688
PE
3526
FACILITY_ID
FA0001946
FACILITY_NAME
El Dorado Food Mart
STREET_NUMBER
1901
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16508019
CURRENT_STATUS
02
SITE_LOCATION
1901 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I 15 May 2014 <br /> AGE Project No . 06- 1457 <br /> Page 4 of 4 <br /> f 3 . 1 . CPTADVANCEMENT <br /> CPT soil borings will be advanced to a depth of 80 feet bsg or until refusal is <br /> encountered utilizing a 25-ton truck- mounted CPT drill rig equipped with 2-inch diameter <br /> �i hollow-stem rods . At all boring locations , the first soil boring will utilize a hydraulic ram <br /> to advance a cone penetrometer to the desired depth . Soil parameters such as cone <br /> 1 bearing , sleeve friction and pore water pressure will be measured as the cone <br /> penetrometer is advanced . Rinseate generated during drilling activities will be <br /> containerized in properly labeled Department of Transportation (DOT)-approved 55- <br /> gallon drums , and stored on-site in an area lacking public access . Disposal alternatives <br /> will be evaluated at a later date based on laboratory results of rinseate . <br /> 3 . 2 . CPT GROUNDWATER SAMPLING <br /> -J Grab groundwater samples will be collected using a HydroPunch sample tool that will be <br /> J pushed into specified zones , then withdrawn approximately three feet to expose an inlet <br /> screen . The interior of the sampling tool fills with water and a 1 -inch outer diameter <br /> stainless steel bailer will be lowered and utilized to extract a groundwater sample . All <br /> rinseate generated during drilling activities will be containerized in properly labeled <br /> UDOT-approved 55-gallon drums , and stored on-site in an area lacking public access . <br /> Following sample collection , samples will be transferred to laboratory-supplied <br /> containers , properly labeled and placed in a chilled container to be transported under <br /> � ] chain of custody to a CDPH -certified laboratory for analysis . <br /> r 3 . 3 . BORING ABANDONMENT <br /> Following borehole advancement, Portland cement (grout mix) will be utilized to backfill <br /> each borehole utilizing a tremie pipe . The SJCEHD will be given the opportunity to <br /> inspect the grout mix prior to backfilling activities . <br /> L . <br /> i <br /> Advanced GeoEnvironmental Inc. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.