My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2057
>
3500 - Local Oversight Program
>
PR0544689
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 9:48:40 AM
Creation date
7/24/2019 9:46:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544689
PE
3526
FACILITY_ID
FA0003735
FACILITY_NAME
QUICK N EASY MART
STREET_NUMBER
2057
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16515309
CURRENT_STATUS
02
SITE_LOCATION
2057 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
28 March 2000 <br /> AGE-NC Project No. 99-0655 <br /> Page 3 of 7 <br /> LOCATION: JOB FUNCTION: LEVELS OF PROTECTION: <br /> Exclusion Zone Excavated USTs A B C D Other <br /> Reduction Zone Preserve samples A B C D Other <br /> and log borings <br /> Support Zone Support functions A B C D Other <br /> Specific protective equipment for each level of protection used is follows: <br /> hard hat <br /> steel-toed boots <br /> Level D: half-faced respirator (if necessary) <br /> doves <br /> safety glasses <br /> If air purifying respirators are authorized, organic vapor and dust is the appropriate canister for use <br /> with the involved substances and concentrations. No down-grading changes of the specified levels <br /> of protection shall be made without the approval of the site safety officer and the project team leader. <br /> 6.0. ON-SITE WORK PLANS <br /> NVork party(ies) consisting of two persons will perform the following tasks: <br /> PROJECT TEAM LEADER: TASK: <br /> Kevin McKibben Collect soil and/or samples: direct probing <br /> FIELD CREW: TASK: <br /> Equipment Operator Operate excavator <br /> Equipment O erator - Field Technician Assist in removal / operate loader <br /> The works party(ies) shall be briefed on the content of this plan prior to initiating onsite work. <br /> ,4dwumced GeoEn\ironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.