My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2315
>
2900 - Site Mitigation Program
>
PR0544690
>
FIELD DOCUMENTS FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 11:33:48 AM
Creation date
7/24/2019 11:24:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
FILE 1
RECORD_ID
PR0544690
PE
3528
FACILITY_ID
FA0005839
FACILITY_NAME
CASTLE AUTOMOTIVE REPAIR INC.
STREET_NUMBER
2315
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12510017
CURRENT_STATUS
02
SITE_LOCATION
2315 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wm. J. <br /> Hunter & Associates 2220 Loma Vista Dr. <br /> Registered Geologists Sacramento, CA 95825 <br /> Petroleum& Mineral Appraisers ALPi (916) 972-7941 <br /> FAX(916) 972-1683 <br /> i <br />! May. 31, I9� 6 <br /> i <br /> i <br /> Steven Sasson, Sr. REHS <br /> San Joaquin County PHS <br /> Environmental Health Division <br /> P.O. 'fox388 <br /> Stockton, CA 95201-0388 <br /> Ref : 2315 No. El Dorado St . , Stockton <br /> We have enclosed a drilling permit application and a check for <br /> $89 . 00 for placing 4" s6il borings/monitoring wells at the above <br /> site as detailed in our approved workplan. ! <br /> Location ''D" will require the use of a limited access .rig because <br /> of the restricted space available behind the shop building. <br /> Spectrum Exploration has equipment that can work in that narrow <br /> space, but the rig will not be available until the week of June <br /> 17 . We are planning on starting on the 17th, using two rigs the <br /> first day - the restricted access rig for location ''D and a <br /> conventional auger rig for the others. We will finish the next <br /> day with just the one standard size unit . ` <br /> The area behind the building is currently filled with soil & <br /> purge water drums; they will be removed or relocated prior to <br /> starting the work. We will also mark the areas and notify USA in <br /> advance of starting operations . <br /> We will confirm the start date at least 48 hours in advance of <br /> beginning the work. <br /> If you have any questions, please give us a call . <br /> Sinc el <br /> U i <br /> Wm. unter & Associates <br /> enc <br /> cc : Steve Valentine <br /> I <br /> 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.