My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2315
>
2900 - Site Mitigation Program
>
PR0544690
>
WORK PLANS FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 11:32:29 AM
Creation date
7/24/2019 11:26:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0544690
PE
3528
FACILITY_ID
FA0005839
FACILITY_NAME
CASTLE AUTOMOTIVE REPAIR INC.
STREET_NUMBER
2315
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12510017
CURRENT_STATUS
02
SITE_LOCATION
2315 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C4010gic,,ITecwcslftc. Page 7 <br /> Dual Phase Extraction Pilot Test Work Plan <br /> Valentine(Castle Motors) <br /> Project No. 764.2 <br /> September 8,2003 <br /> LOur proposed schedule for performing the work proposed above is: <br /> Feasibility Study <br /> ❑ Submit dual phase work plan September 2003 <br /> ❑ Receive work plan approval from SJC PHS/EHD October 2003 <br /> ❑ Submit Cost Pre-approval to the Fund November 2003 <br /> ❑ Receive Approval of Costs from the Fund December 2003 <br /> ❑ Perform dual phase pilot test February 2004 <br /> ❑ Submit the dual phase test report April 2004 <br /> 5.0 SIGNATURES & CERTIFICATION <br /> Geological Technics Inc. will perform this project in accordance with accepted geologic and <br /> hydrologic.standards of the State of California accepted and in effect at the time of this <br /> rinvestigation. Geological Technics Inc. is not responsible for undisclosed conditions. <br /> 4 <br /> This work plan was prepared by: <br /> Jos . Angulo <br /> Geo ogist <br /> Qao�ES&O <br /> 0. <br /> �F <br /> h� it.t.K/181ANI�W N <br /> t, N <br /> r Raynold I. Kablanow II, Ph.D. <br /> 4•+ California Registered Geologist #5234401. <br /> g. <br /> California Certified Hydrogeologist #442 <br /> SOP <br /> L <br /> L <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.