Laserfiche WebLink
C4010gic,,ITecwcslftc. Page 7 <br /> Dual Phase Extraction Pilot Test Work Plan <br /> Valentine(Castle Motors) <br /> Project No. 764.2 <br /> September 8,2003 <br /> LOur proposed schedule for performing the work proposed above is: <br /> Feasibility Study <br /> ❑ Submit dual phase work plan September 2003 <br /> ❑ Receive work plan approval from SJC PHS/EHD October 2003 <br /> ❑ Submit Cost Pre-approval to the Fund November 2003 <br /> ❑ Receive Approval of Costs from the Fund December 2003 <br /> ❑ Perform dual phase pilot test February 2004 <br /> ❑ Submit the dual phase test report April 2004 <br /> 5.0 SIGNATURES & CERTIFICATION <br /> Geological Technics Inc. will perform this project in accordance with accepted geologic and <br /> hydrologic.standards of the State of California accepted and in effect at the time of this <br /> rinvestigation. Geological Technics Inc. is not responsible for undisclosed conditions. <br /> 4 <br /> This work plan was prepared by: <br /> Jos . Angulo <br /> Geo ogist <br /> Qao�ES&O <br /> 0. <br /> �F <br /> h� it.t.K/181ANI�W N <br /> t, N <br /> r Raynold I. Kablanow II, Ph.D. <br /> 4•+ California Registered Geologist #5234401. <br /> g. <br /> California Certified Hydrogeologist #442 <br /> SOP <br /> L <br /> L <br /> L <br />