My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2315
>
2900 - Site Mitigation Program
>
PR0544690
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 11:47:13 AM
Creation date
7/24/2019 11:27:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544690
PE
3528
FACILITY_ID
FA0005839
FACILITY_NAME
CASTLE AUTOMOTIVE REPAIR INC.
STREET_NUMBER
2315
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12510017
CURRENT_STATUS
02
SITE_LOCATION
2315 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTH DEPARTMENT <br /> - E <br /> SAN JOAQUIN COUNTY ' Unit Supervisors <br /> °� Carl Borgman,R.E.H.S. <br /> e %?� Donna K.Heran,R.E.H.S. 304 East Weber Avenue, Third Floor Mike Huggins,R.E.H.S.,R.D.I. <br /> Director <br /> Californiaouglas W.Wilson,R.E.H.S. <br /> Al Olsen,R.E.H.S. Stockton, alifornia 95202-2708 <br /> • y `P. <br /> Margaret La orio,R.E.H <br /> Program Manager Telephone: (209) 468-3420 <br /> Fax: (209) 464-0138 Robert vccllon;R.E.H..Ss <br /> FLaurie A.Cotulla,R.E.H.S. Mark Barcellos,R.E.H.S, <br /> Program Manager . <br /> STEPHEN VALENTINE <br /> STEVE & GENES SERVICE <br /> 6232 HEMET AVE <br /> STOCKTON CA 95207 <br /> RE: STEVE&GENES SERVICES <br /> SITE CODE: 2080 <br /> 2315 N EL DORADO ST <br /> STOCKTON CA 95204 <br /> WORKPLAN: Feasibik Stud Work Plan Dual Phase Soil Vapor and Groundwater Extraction Pilot Test <br /> DATED: September 8.2003 <br /> PREPARED BY: Geolo3icalTechnics Inc. GT <br /> APPROVED with Conditions (See Below) <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORKPLAN (H&S <br /> 25299.37,subd.(c)(3).) <br /> 1. Install one 4-inch dual-phase extraction well(EW-1) and two 4-inch soil vapor <br /> monitoring/extraction wells (VEW-1,VEW-2) to evaluate the parameters needed in <br /> designing a dual-phase soil vapor extraction and groundwater extraction remediation system. <br /> 2. Conduct a 5-day pilot test using the proposed extraction well consisting of a soil vapor <br /> extraction test and a groundwater extraction test. <br /> 3. Collect soil vapor and groundwater samples during the pilot test for laboratory analyses. <br /> 4. Prepare a report of findings including calculation of the radius of influence of the soil vapor <br /> extraction test and the effect of the groundwater pump test. <br /> COMMENTS AND CONDITIONS: <br /> 1. Modify the screen section of the proposed EW-1 from 20 feet below surface grade (bsg) to <br /> 60 feet bsg,to 20 feet bsg to 55 feet bsg. Kevin Graves of the State Water Resources <br /> Control Board(SWRCB)has expressed concerns of potential vertical flow(ambient flow) of <br /> groundwater and cross-contamination of aquifers in long well screens,and requested <br /> ambient flow be measured in wells with screen section over 20 feet below groundwater. The <br /> last depth to groundwater level at the site was measured at approximately 36 feet bsg <br /> (September 2003). Reducing the screen length of EW-1 to less than 20 feet of screen below <br /> groundwater eliminates the need of measuring ambient flow in the well. <br /> 2. Install the wells by December 17,2003. However,if possible EHD recommends that the <br /> wells be installed in the same mobility as the installation of the monitoring wells (Oct,2002 <br /> work plan by GTI) during the 3`a week of November,2003 to maximize cost-effectiveness. <br /> DATED November 15 2003 BY <br /> Cc: CRWQCB,Central Valley Region—James L.L.Barton,RG <br /> Cc: Geological Technics,Inc.-Raynold I.Kablanow <br />
The URL can be used to link to this page
Your browser does not support the video tag.