Steve & Gene's Richfield -2- February 21, 2003 <br /> Claim No. 000417 <br /> # Task* Amount Pre-Approved Comments <br /> 6 Project Management $1,500 <br /> TOTAL PRE-APPROVED $ 90,755 <br /> * Task descriptions are the same as those identified in Geological Technics Inc.'s January 6,2003 cost estimate. <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it <br /> to remain valid. Only the tasks/costs reflected on the above table are pre-approved at this <br /> time. The Fund will review any tasks/costs that go beyond the pre-approved amount to <br /> determine if the additional tasks and costs are necessary and reasonable. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control <br /> Board. <br /> • The Fund regulations require three bids for corrective action work unless three bids are <br /> unnecessary, unreasonable or impossible under the particular circumstances. Because the <br /> proposed costs appear reasonable, it is unnecessary to obtain three bids for the proposed <br /> corrective action efforts; the Fund's three bid requirement is waived for this scope of work <br /> only. Any future scopes of work are subject to the three bid requirement unless a waiver of <br /> the bidding requirements is received. <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs <br /> on the new scope of work. <br /> • Although I have referred to Geological Technics Inc.'s proposal in my pre-approval above, <br /> please be aware that you will be entering into a private contract: the State of California <br /> cannot compel you to sign any specific contract. This letter pre-approves the costs as <br /> presented in the proposal dated January 6, 2003 by Geological Technics Inc. for <br /> implementing the June 27, 2002, Geological Technics Inc. workplan. <br /> If you need assistance in procuring contractor and consultant services, don't hesitate to call me. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in <br /> the Reimbursement Request Instructions to confirm that the costs are consistent with this pre- <br /> approval before you will be reimbursed. Please insure that your consultant prepares their <br /> invoices to include the required break down of costs on a time and materials basis, that <br /> invoiced tasks are consistent with the original proposal, and that reasonable explanations are <br /> provided for any changes made in the scope of work or increases in the costs. When the <br /> invoices are submitted you must include copies of all: <br /> • subcontractor invoices, <br /> • technical reports, when available, and <br /> California En vironmental Protection Agency <br /> Zo'*RecydedFape, <br />