My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2315
>
2900 - Site Mitigation Program
>
PR0544690
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 11:47:13 AM
Creation date
7/24/2019 11:27:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544690
PE
3528
FACILITY_ID
FA0005839
FACILITY_NAME
CASTLE AUTOMOTIVE REPAIR INC.
STREET_NUMBER
2315
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12510017
CURRENT_STATUS
02
SITE_LOCATION
2315 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL 2VIRONMENT HEALTH <br /> 6 200 <br /> Geofogica(Technics Inc. EN <br /> PRiIT/SERVICES <br /> 2741 River Road <br /> Modesto,California 95351 <br /> (209)538-6424/'Fax#538-5852 <br /> July 18, 2001 <br /> Project No.: 723.2 <br /> Project Name: Valentine(El Dorado St.) <br /> Ms. Linda Sanborn <br /> State Water Resources Control Board <br /> 2014 T Street, Suite 130 <br /> P.O. Box 944212 <br /> Sacramento, CA 94244-2120 <br /> RE: Cost.Pre-Approval: Vertical Definition Work Plan <br /> Location: 2315 N. El Dorado St.; Stockton, CA <br /> County Site Code: 9401; USTCFP Claim#0417 <br /> Dear Ms. Sanborn: <br /> On October 4, 1999, Geological Technics Inc. (GTI) submitted an Additional Site <br /> Characterization Report that documented the. installation of a deep, discretely screened <br /> monitoring well and a deeper soil boring at.the above site. Analytical data shows the presence <br /> of gasoline range petroleum hydrocarbons in the soil and groundwater to a depth of at least 110 <br /> feet bgs. <br /> In a letter dated August 1, 2000, Mr. Jeff Wong of SJC PHS/EHD issued a letter directing that a <br /> work plan for the investigation of the vertical definition of the plume be submitted by August <br /> 25, 2000. On August 24, 2000, GTI submitted a"Vertical Definition Work Plan" dated August <br /> 23, 2000 to SJC PHS/EHD. The SJC PHS/EHD approved the proposed work plan in a letter <br /> dated June 14, 2001. <br /> Proposed Direction of Project <br /> This opinion of cost includes the following work: <br /> • Install one deep-screened groundwater monitoring well to a depth of 152.feet. <br /> • Obtain 5 soil.samples for laboratory analysis. . . <br /> • Obtain 5 soil pore water samples utilizing a SimulProbe sampling device. <br /> • Perform one year (four consecutive quarters) of groundwater monitoring—eight wells. <br /> • Prepare and submit report on the installation of the deep well. <br /> • Prepare and submit reports for the quarterly monitoring reports. <br /> Attached are the pertinent documents for this project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.