Laserfiche WebLink
Geo'ogicafTecknics Inc. <br /> Page 7 <br /> Valentine(Castle Motors) <br /> Vertical Def.WP <br /> August 23,2000 <br /> 3.0 SCHEDULE & REPORTING <br /> Geological Technics Inc. anticipates beginning fieldwork no later than 30 days after work <br /> plan approval, cost pre approval from the Fund and upon issuance of the drilling permit. <br /> The information gathered during this phase of work will be presented in a report that will <br /> include a summary of the .geology as well as the results of sample analyses. Dr. Ray <br /> Kablanow, a Registered Geologist and Certified Hydrogeologist, will supervise the project. <br /> Copies of the report will be forwarded to both the appropriate County and State regulatory <br /> agencies (SCDER and CRWQCB). <br /> 4.0 SIGNATURE AND CERTIFICATION <br /> This project will be performed by Geological Technics Inc. in accordance with accepted <br /> geologic and hydrologic standards of the State of California accepted and in effect at the <br /> time of this investigation. Geological Technics Inc. is not responsible for undisclosed <br /> conditions. <br /> This work plan was prepared by: <br /> Joseph D. Angulo <br /> Geologist <br /> Raynold L Kablanow II, Ph.D. <br /> California Registered Geologist#5234 <br /> Certified Hydrogeologist#442 <br />