Laserfiche WebLink
i <br /> Ground Zero Analysis,Inc. <br /> Valentine Property <br /> Project No.:723.2 <br /> Well Destruction Work Plan Addendum <br /> April 30,2013 <br /> Initial Method <br /> Based on the recommendations,of the CMT well manufacturer(Solinst), a pressure grouting <br /> method is recommended for the destruction of CMT wells MW-7, MW=B and MW-9 as over- <br /> drilling has shown to be difficult and ineffective.The pressure grouting method is as follows: <br /> • A thin cement grout will be pumped:under.pressure:through a:small diameter trentie tube <br /> to the bottom of each chamber of the CMT well. In this manner, the grout will displace <br /> the water in the well ensuring that it completely filled with grout. Solinst recommends <br /> a grout mixture of 55 lbs ultrafine cement, 2.2 lbs of super plasticizer and 110 lbs of <br /> water,or about 13.2 gallons. The tie nie tubing will be left in the well. °-""A <br /> • After,the grout has been filled to the top of each chamber of the CT--well, a pressure (/y�„ <br /> cap will be fitted to the casing and .the well pressurized to .25 psi.. If the grout settles, �C <br /> Additional grout will be pumped into the well casing. This will force the cement into the <br /> filter], <br /> pack. <br /> • After the grout has been installed, the top of casing of the CMT wells will be drilled out <br /> to a depth of 5 ft below grade and the holes will be filled with clean dirt and capped with f <br /> asphalt or concrete in the upper'8 iriches below-grade for. wells in asphalted or concrete -` ° <br /> areas.(respectively). <br /> Secondary Method <br /> In the case that the pressure grouting of the CMT wells is-not.successful, each of the three � <br /> CMT wells will have their entire contents drilled out and the borehole filled with neat cement <br /> grout to grade. An 8 inch hollow-sten auger fitted with a special designed stinger to keep it '- <br /> � <br /> centered in the well is proposed.to drill out the well, As an added step.to stay centered within <br /> the well,.the drilling will,be continuous'without stopping to clean the augers until we reach <br /> total depth. <br /> i <br /> If you should have any questions please do not hesitate-to call. <br /> Respectfully Submitted; �S�ONAL SFO <br /> Ra n o Digita'V signed by Raynold Kablanow ZO <br /> SDN:c= ynold Kablanow,o <br /> 5u=(a]eol gicalTech cs, RAYNOLD 1. �N <br /> Ka I a + w-em gt gtienv.com, <br /> azo, °- KABLIINOW <br /> No.5234 <br /> Raynold I. Kablanow II, Ph.D. sJ <br /> California Professional Geologist#5234 9TFOF CA1�Fp�� <br /> Certified'Hydrogeologist#442 <br /> cc: Harlin Knoll—SJC EHD <br /> Mike Smith -CRWQCBCVR <br />