My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2315
>
2900 - Site Mitigation Program
>
PR0544690
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 11:43:16 AM
Creation date
7/24/2019 11:35:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0544690
PE
3528
FACILITY_ID
FA0005839
FACILITY_NAME
CASTLE AUTOMOTIVE REPAIR INC.
STREET_NUMBER
2315
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12510017
CURRENT_STATUS
02
SITE_LOCATION
2315 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ceotogica(Tet�1docs tac. ti <br /> 1172 Kansas Avenue <br /> Modesto,California 95354 <br /> (209)522-4119/Fax(209)522-4227 <br /> REU <br /> ED <br /> September 20, 2011 . V <br /> Project No.: 723.2 �Q11 <br /> Project Name: Valentine/Castle Motors (El Dorado) ENVIRONMEN AL HEALTH, <br /> PERMIT/SERVICES <br /> Mr. Harlin Knoll <br /> San Joaquin County Environmental Health Department <br /> 600 East Main Street <br /> Stockton CA 95202-2708 <br /> RE: Castle Motors <br /> 2315 N. El Dorado St. <br /> Stockton, CA <br /> Dear Mr. Knoll: <br /> I am writing to request an extension for the submittal of the Pilot Study Evaluation report, as <br /> directed in a SJCEHD letter dated April 25`h, 2011. As stated in the directive, GTI was to begin <br /> the pilot study by July 0, 2011 and the subsequent Pilot Study Evaluation report was to be <br /> submitted by October 1St, 2011. Due to various remediation system installation and start-up <br /> delays, GTI was unable to begin the pilot study until August 31St, 2011. The pilot study was <br /> designed for a 3 month period, therefore ending on November 30`h 2011. <br /> Various installation delays and modifications led to delays in starting.the system. Due to the <br /> noise and heat generated from the remediation equipment, several modifications were made in <br /> order to operate the equipment properly. These modifications along with permitting procedures <br /> and system testing delayed the commencement of the pilot study. <br /> On behalf of Mr. Steve Valentine, we respectfully request an extension of the remediation Pilot <br /> Study Evaluation report from October 1St, 2011 (per your April 25th, 2011 correspondence) to <br /> December 31St, 2011. This time frame would allow for the three month pilot study and one <br /> month following to evaluate the data and compile the Pilot Study Evaluation report. <br /> I <br /> If you have any questions or need additional information, please contact me at (209) 522-4119. <br /> Respectfully Submitted <br /> Raynold 1. Kablanow Il, Ph.D. <br /> Vice President <br /> cc: Mr. Steve Valentine <br /> Mr. Nuel Henderson - San Joaquin County Public Health Department <br /> James Barton - CRWQCB-CVR <br />
The URL can be used to link to this page
Your browser does not support the video tag.