My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2315
>
2900 - Site Mitigation Program
>
PR0544690
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 11:43:16 AM
Creation date
7/24/2019 11:35:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0544690
PE
3528
FACILITY_ID
FA0005839
FACILITY_NAME
CASTLE AUTOMOTIVE REPAIR INC.
STREET_NUMBER
2315
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12510017
CURRENT_STATUS
02
SITE_LOCATION
2315 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• October 20711 based on the attenuation factor calculated for MW-3(40004) <br /> • May 2094: based on the attenuation factor calculated for MW-3 with a 30% factor of safety. <br /> GZA agrees with the calculation that the core of the groundwater plume(MW-3 &MW-5) will reach <br /> MCLS for benzene (<I ug/L) between May 2036 (4001) and October 2071 (40004), depending on <br /> the attenuation factor used. It is expected that the groundwater plume will collapse in on itself with <br /> edges of the contaminant plume (MW-1, MW-6, MW-8 & MW-108) degrading at a faster rate than <br /> the core. <br /> Well Destruction Procedures <br /> We concur with the wel I abandonment procedure for MW-201 as stated in the SJCEHD letter dated <br /> May 21,2013. <br /> • Drill out the well to TD(155 ft bgs) <br /> • Leave steel conductor casing in place down to 46 ft bgs <br /> • Grout the borehole from the base up using.a tremie pipe.The borehole wil I be grouted from <br /> its base to the ground surface. <br /> We concur with the well abandonment.procedure for the three(3) CMT wells as stated in the <br /> SJCEHD letter dated May 21, 2013. <br /> • Use 100 grain prima'cord,place to the full depth of the CMT well in the center channel. If the <br /> center channel-is plugged,the SJCEHD will be informed immediately. <br /> • Grout well channels(if preferred by blasting contractor) <br /> • Detonate explosive <br /> • Drill out the entire contents of the well using stinger and auger equipment <br /> • Grout the borehole from the base up using a tremie pipe.The borehole will be grouted from <br /> its base to the ground surface. <br /> Please contact me at (209) 522-4119 should you have any questions or need more <br /> information. <br /> Thank you, <br /> ! �nNAL G� , <br /> ^ 1 r Digitally signed by Raynold 40 <br /> K Kabl- �{ <br /> �laynold Kabl w, <br /> ou, e ogical Ted <br /> IRA1iN0lD 1_ <br /> ien • .r KARLANO <br /> --- Dat:20i3.06:81 0853-0T00'' iii ° ¢+ - <br /> 1No.523A <br /> � <br /> s <br /> Raynold 1. Kablanow II, PhD <br /> PG, CHG <br /> CC: Steve Valentine <br /> Jim Barton, RWQCB - CV <br />
The URL can be used to link to this page
Your browser does not support the video tag.