My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0008494
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2315
>
2900 - Site Mitigation Program
>
PR0544690
>
ARCHIVED REPORTS XR0008494
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 1:06:24 PM
Creation date
7/24/2019 11:39:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008494
RECORD_ID
PR0544690
PE
3528
FACILITY_ID
FA0005839
FACILITY_NAME
CASTLE AUTOMOTIVE REPAIR INC.
STREET_NUMBER
2315
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12510017
CURRENT_STATUS
02
SITE_LOCATION
2315 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEL-TECH Geotechnical Support Services <br /> MONITORING WELL FIELD LOG <br /> PROJECT NAME:Castle Motors [DATE: <br /> MPLE ANALYSIS PERFORMED : TPH-Gas, B T X E <br /> 23'15 N. F„1 Dorado Sfreet MPLE TIME: 13 05 <br /> Stockton,CA AMPLE CONTAINER(S)- 3 V O A's <br /> ALYSIS PERFORMED BY FGL LABS <br /> CLIENT HUNTER&ASSOCIATES 02/02/96 <br /> PROJECT MANAGER: BILL HUNTER MPLE LOCATION MW-2 <br /> AMPLER• DON LIGHT ART TIME: <br /> GROUNDWATER. XXX ADOSE. OTHER., P I D WELL HEAD READING 365 0 PPM <br /> CASING ELEVATION: FEET MSLCASING DIAMETER 2 INCH <br /> DEPTH TO WATER:42 79 FEET 12ALCULATED CASING VOLUME- 3 33 GAL <br /> DEPTH OF WELL: 63 20 FEET OTAL VOLUME PURGED, 10 5 GAL <br /> TIME VOLUME pH E.C. umhoslem TEMP. COLOR OTHER <br /> allons units Degrees C (Visual) <br /> 0 68 1141 200 TURBID (BRN) GAS ODOR <br /> 35 70 1153 203 " <br /> 70 69 1154 202 " <br /> 105 69 1148 201 " <br /> PURGE METHOD : 3 FOOT STAINLESS STELL BAILER WITH ELECTRONIC BAILER SPOOL <br /> SAMPLE METHOD: 3 FOOT STAINLESS STEEL BAILER <br /> DEPTH TO WATER AFTER PURGE: 43.10' DEPTH TO WATER AT SAMPLE TIME <br /> WELL INTEGRITY: CAP AND SEAL ARE SECURE, NO LOCK 1S INSTALLED <br /> REMARKS: GOOD RECHARGE <br /> WEATHER. CLEAR SKIES <br /> QUALITY CONTROL. ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH STEAM CLEANER&ALCONOX <br /> NEW NITRILE GLOVES WERE WORN AT ALL TIMES <br /> WELL LOCATION: NORTH <br /> CONTAINMENT: DO T 17 DRUMS <br /> INSTRUMENTATION: ORION pH/TEMPERATURE METER 2 POINT pH CALIBRATION (4 0 &7 0) <br /> ORION CONDUCTIVITY METER <br /> ENVIRONMENTAL INSTRUMENTS SLOPE METER <br /> KECK PRODUCT INTERFACE METER <br /> THERMODYNE 580B PHOTO IONIZATION DETECTOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.