My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0008518
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2315
>
2900 - Site Mitigation Program
>
PR0544690
>
ARCHIVED REPORTS XR0008518
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 1:20:47 PM
Creation date
7/24/2019 11:42:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008518
RECORD_ID
PR0544690
PE
3528
FACILITY_ID
FA0005839
FACILITY_NAME
CASTLE AUTOMOTIVE REPAIR INC.
STREET_NUMBER
2315
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12510017
CURRENT_STATUS
02
SITE_LOCATION
2315 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GeoCogtcnC7echnics Inc Page 4 <br /> Work Plan <br />' Valentine(Castle Motors) <br /> Project No 723 2 <br /> . April 11,2000 <br /> The detection limits forh <br /> t ese compounds are listed below A Chain of Custody will be <br /> completed for all samples collected and tracked to ensure sample integrity <br /> etection imits3TEX TPH-(jEthers TB <br /> EYV-51—er µ <br /> 3.0 SCHEDULE & REPORTING <br /> Geological Technics Inc anticipates beginning fieldwork no later than 30 days after work <br /> plan approval, issuance of the drilling permit and upon cost pre-approval by the USTCFP It <br /> is anticipated that there may be a delay in negotiating access from the City of Stockton to <br /> drill the GeoProbe borings through the city streets and sidewalk However, every effort will <br /> be made to move this project forward in a timely manner <br /> The information gathered during this phase of work will be presented in a report Dr Ray <br /> Kablanow, a registered geologist, will supervise this project Copies of the reports will be <br /> submitted to the client, SJC PHS/EHD, RWQCB-CVR and USTCFP <br /> 4.0 SIGNATURE AND CERTIFICATION <br /> This project will be performed by Geological Technics Inc in accordance with accepted <br /> geologic and hydrologic standards of the State of California accepted and in effect at the time <br /> of this investigation Geological Technics Inc is not responsible for undisclosed conditions <br /> rThis work plan was prepared by <br /> Geo loguaC7ecFirrrrs Znc. <br /> � r <br /> v <br />' Michael J Niemi <br /> Geologist OtE5510 <br /> Qa c <br /> � F <br /> r <br /> No 5234 <br /> r Raynold Iablanow II Ph D * g• ? I <br /> California Registered Geologist#5234oa:cAI&p��\� <br /> Certified Hydrogeologist#442 <br /> r <br /> r <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.