Laserfiche WebLink
1111811997 11 2J '!�1b-853-8028 TEG NORTHERN CALIF FADE b2 <br /> r <br /> OF-NEPAL PROVISIONS 1r <br /> WIDATION — This permit is not valid unless signed by the Public Works Direoto•or his authorized representative <br /> 2 REVOCATION -- This permit is nontransferable and is void it work is hot completed prior to expiration date An extension-may be granted <br /> if such extension to requested forty-eight hours before the permit expires I ,I <br /> 3 ACCEPTANCE OF PROVISIONS — It is understood and agreed'by+the psnTlitte8,4hat the ddng.Ot any work undw the permit 9hall1rJOns1ttut9 <br /> an aoceptanc&of the praviotons. <br /> 4 KEEP PERMIT ON JOBSITE — The permit and control number shall be kept on the )obsite and shall be shown to any representative of the <br /> City requesting verification of permit issuance <br /> 5 INSPECTION AND APPROVAL — Xmitilmum of(M}twonty-tour hours notice shall be required prior to placing any backfill, aonn6ctwn <br /> to any axisting!$cility,p r tits placement of any concrete a(-.paWng,w,9rk Inspeotion shall not be deemed $,wsilverioq the part of the City of <br /> the right to demand coitecdon of aafeots discovered at a subsequent date - <br /> 5 STANDARD SPECIFICATION%— AiLwork stsalt conform to the City of Stockton standard specifications, <br /> 7 MINIMUM INTSRFERENCf'rWITH ANDS ,PRO7ECTIONIOF TRAF!M— All wossk shall b'9 planned aAd carred out-so,there will•br;r the-least <br /> possible Inconvenience to the traveling public Placing of lights, barricades, warning signs and other safety devices required for public safety <br /> shall be the responsibility of the permittee All eafaty provisions and devices shall Conform to the requirements Of Chapter 6 of the State of <br /> California Traffic Manual ' ^t <br /> 8 FAILURE TO COMPLY WITH GENERAL PROVISIONS — The permittee agrees 10 reimburse the City for performing all work and furnishing <br /> all material to correct any failure to comply with these provisions as well as all applicable City ordinances and standards and Specifications <br /> currently In effect. <br /> 9 NOTIFICATION OF UTILITY COMPANY — The permittee shall notify utility companies 48 flours prior to beginning any construction which <br /> may Involve underground or overh4ad facilities and will pay all expenses for any removal or relocation necessary Valves on water me)ns•may <br /> not be turned otf without permission of the utility company involved <br /> 10 NOTIFICATION OF POLICE, FIRE AND PUBLIC WORKS DEPARTMENTS -- When streets are to be blocked, the Police, Fire and Public <br /> Works Departments are to be notified each day the street is to be blocked and/or when traffic Is delayed or hindered Aces$&10 fire hydrants <br /> shall be maintained at all times Streets will not be closed without prior approval of City Traffic Engin49r and Permit Engineer <br /> LSANUP OF! JOBSITE — The permittee will remove any refugia material from the Jobalte within three days after completion of the work <br /> ELINQUENT BILLS — Failure to pay any delinquent bili accrued under any previous permit Issued by the Department of Public Works will <br /> be cause for rendering the applicant ineligible for any other permit from the Ospartment of Public Works until such bill is paid <br /> 13 MEETING EXISTING IMPROVEMENT --• The permitt8s shall be responsible for meeting all adjacent frontage improvements such as paying <br /> and sidewalks <br /> TO THE PERMITTEE <br /> To provide a more efficient and economical Inspectiett service for Enoroachment Permit construction,we are asking that the following procedure <br /> be lollowed by all parmitt9es <br /> s t Notify the P6rmit Engineer, (209) 937 8411,and obtain a control number at feast twenty <br /> (2 4)hears prier to the start of work <br /> , <br /> 2 Discuss with the Permit Engineer or inapeotor any unusual Or difficult features of the cvnstruotion <br /> 3. Advise Permit Engineer of name and phone number of contact person for the project prior to beginning work <br /> 4 Notify.the Permit Engineer one day In advanoe,to cancel a scheduled inspection or to request an additional or earlier inspection <br /> 5 Notify the Permit Engineer upon completion of construCtioft. (209)937.8411 <br /> INSPECTION SCHEDULE <br /> Listed below are several types of construction and points at which inspection must be made prior to continuing construction operation Unauthorized <br /> continuance of constructton beyond an inspection point may result In rejection of all work <br /> CONCRETE PIPE LAYING <br /> 1 Grade and excavation before forming 1 Excavation and bedding <br /> z Forms before placement of concrete 2. Pipe laying <br /> 3 Cleanup and final approval 3. Backfill (Compaction test may be required) <br /> r. 4 Final approval <br />