Laserfiche WebLink
DEL-TECH Geotwj=cal support-,ecus,,% <br />' MONITORING WELL FIELD LOG <br /> 1996 <br /> PROJECT NAM - LE ANALYSIS PERFORMED : TPH-Gas B T X E <br /> AMP I <br /> CASTLE MOTORS xT.B.E.2315 K EL DORADO STREET PLE TIME:20.49 <br /> STOCKTOK CA PLE CONTAINER(S): HCL PRESERVED <br /> V OA ss& 1 BAILER BLANK <br /> ONTA3NERS SUPPLIED BY LABORATORY <br /> NAILYSIS PERFORMED BY: FGL LABS <br /> CLIENT. HUNTER&ASSOCIATES DATE: 07/01/1996 <br />' PROJECT MANAGER: BILL HUNTER AMPLE LOCATION: MW-1 <br /> AMPLER: DON LIGHT TART TIME: <br />' GROUNDWATER: XXX IWOOSE: THER:WELL HEAD P I D READING 8 0 PPM <br /> CASING ELEVATION: FEET MSL)__ ASING DIAMETER: 2 INCH <br /> DEPTH TO WATER: 37 88 FEET CALCULATED CASING VOLUME: 5 22 GAL <br /> DEPTH OF WELL: 69 90 FEET TOTAL VOLUME PURGED: 22 0 GAL <br /> TIME VOLUME pH E.C. TEMP. O.R.P. COLOR OTHER <br /> altons units Umhoslcm De fees G (mvolts) (Visua[ <br />' 0 71 1208 210 NIA LT TURBID GAS ODOR <br /> 55 72 9200 202 " CLEAR " <br />' 110 72 1189 200 <br /> 165 72 1190 200 <br />' 220 72 1184 199 " " <br />' PURGE METHOD : SUBMERSIBLE PURGER PUMP <br /> SAMPLE METHOD: 1'STAINLESS STEEL BAILER <br />' DEPTH TO WATER AFTER PURGE: DEPTH TO WATER AT SAMPLE TIME: 3817' <br /> WELL INTEGRITY: CAP AND SEAL ARE SECURE <br /> REMARKS- GOOD RECHARGE <br /> WEATHER: CLEAR SKIES <br />' QUALITY CONTROL: ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH STEAM CLEANER&ALCONOX <br /> NEW NITRILE GLOVES WERE WORN AT ALL TIMES <br /> WELL LOCATION' SEE SITE MAP <br />' CONTAINMENT: POLY DRUMS <br /> INSTRUMENTATION: ORION pHITEMPERATURE METER 2 POINT pH CALIBRATION (4 0 &7 0) <br /> ORION CONDUCTIVITY METER <br /> YSI 3560 FLOWCELL CHAMBER 1 D O METER <br /> SOLINIST SLOPE METER/KECK PRODUCT INTERFACE METER <br /> THERMODYNE 580B PHOTO IONIZATION DETECTOR <br />