Laserfiche WebLink
Geolegi al Tecknxs lne Page 9 <br /> Additional Site Characterization Work Plan <br /> Project No 724 2 <br /> June 27, 2002 <br /> 3.0 SCHEDULE & REPORTING <br /> Geological Technics Inc anticipates beginning fieldwork no later than 30 days after work <br /> plan approval and upon issuance of the drilling permit The information gathered during <br /> this phase of work will be presented in a report that will include a surrunaiy of the geology <br /> Dr Ray Kablanow, a registered professional geologist, will supervise the project Copies of <br /> the report will be forwarded to both the appropriate County and State regulatory agencies <br /> (SJC/EHD and CRWQCB-CVR) Groundwater monitoring will occur on a quarterly basis <br /> A report will be issued for each monitoring event and submitted to the County and State <br /> agencies <br /> 4.0 SIGNATURES & CERTIFICATION <br /> Geological Technics Inc will perform this project in accordance with accepted geologic and <br /> hydrologic standards of the State of California accepted and in effect at the time of this <br /> investigation Geological Technics Inc is not responsible for undisclosed conditions <br /> • This work plan was prepared by <br /> Josep D Angulo <br /> G 10 io ist <br /> QR�'FES�fp�� <br /> I mei ain ° <br /> .rn <br /> [[ NO 5234 '+ <br /> Raynold I Kablanow II, Ph D 9 . 3t." <br /> California Registered Geologist#5234 F F CAU� <br /> Registered Environmental Assessor#901 <br /> • <br />