Laserfiche WebLink
DEL-TECH GEOTECHNICAL SUPPORT SERVICES <br />' MONITORING WELL FIELD LOG 2003 <br />' SAMPLE LOCATION/MW - 101 DATE: 9/12/2003 <br />' PROJECT NAME CASTLE MOTORS ANALYSIS PERFORMED SEE CHAIN OF CUSTODY <br /> ADDRESS 2315 N ELDORADO SAMPLE TIME 15 30 <br /> CITY,STATE STOCKTON,CA SAMPLE CONTAINERS 2 VOA'S <br />' SITE CONTACT PRESERVATIVES HCL <br /> CONSULTANT GEOLOGICAL TECHNICS LAB ANALYSIS BY SHERWOOD LABS <br />' PROJECT MANAGER JOB ANGULO MONUMENT FLUSH <br /> SAMPLER 4 DEL-TECH WELL CASING MATERIAL PVC <br /> SIGNED WELL CASING DIA 2" / 0 1632 <br /> SAMPLE MEDIA LN GROUNDWATER P I D READING/ODOR NIA MUSTY <br />' TOP OF CASING ELEVA ON MSL COLOR CLEAR <br /> DEPTH TO WATER (feet 100th's) 3691 FEET CALC PURGE VOL 9 80 GAL <br /> DEPTH OF WELL (feet 100th's) 9694 FEET TOTAL VOLUME PURGED 2939 GAL <br /> STANDING WATER COLUMN 6003 FEET DEPTH OF PUMP NIA FEET <br /> FIELD PARAMETERS <br /> TIME CUMULATIVE DRAW PUMPING pH E C TEMP ORP DISSOLVED1 TURBIDITY <br /> CASING VOLUME DOWN RATE OXYGEN COLOR <br />' PERPURGE (D T W) (GPMILPM) (units) (MsMHOS) (Celsius) (Mvo]ts) (PPM) (NOT Irl ) <br /> 0 NIA 5 GPM 801 840 201 -170 034 CLEAR <br /> 980 8 05 831 199 -172 o4 " <br />' <br /> 19 S07 832 199 -170 C3 r <br /> ?�39 ( S 08 S IS 3 -169 0-27 <br /> PURGE METHOD DEDICATE�AT�_�9PU?+� <br /> SAMPLE METHOD DEDICATED Vi ATERRAPUVIP <br />' D T W AFTER PURGE D T 8V AT SAMPLE TIME 5989 <br /> WELL INTEGRITY CAP&SEAL ARE SECURE. <br /> WELL LOCATION SEE SITE MAP <br />' REMARKS <br /> WEATHER CLEAR&HOT WIND <br />' QUALITY CONTROL ALL PURGING EQ UIPMENT AND SAMPLING EQ UIPMEATT WAS CLEANED IN THE <br /> FIELD WITH A STEAMCLEANER&ALCONOX SOAP NEW NITRILE GLO17ES <br /> CONTAINMENT D O T 17 55 GAL STEEL DRUM OR 60 GAL POLY DRUM <br /> INSTRUMENTATION Y S I 3560FLOWCELL Y S I DISSOLVED OXYGEN METER <br /> SOLINIST SLOPE METER THERMODlNF-580B P I D <br /> KECK JN7MRFACE METER TURBIDITY METER <br />