Laserfiche WebLink
r ' <br /> Table 2 Summary of Soil Boring Water Sample Analytical Data <br /> Valentine(Castle Motors) <br /> 2315 N.El Dorado <br /> Stockton,CA <br /> Project No 723 2 <br /> Date Boring Depth Benzene Toluene Ethyl Total TPH TPH-MO MTBE DIPS ETBE TAME TBA <br /> u u Benzene Xylenes Gasolme u u u UU& u u <br /> ug/L ug/L ug/L <br /> 9/29/1997 SP-1 43' ND<0 3 ND<0 3 ND<0 3 ND<0 6 66 N/A ND<20 ND<20 ND<20 ND<20 ND<20 <br /> 10/8/1997 SP-4 40' ND<0 3 ND<0 3 ND<0 3 ND<0 6 ND<50 N/A ND<20 ND<20 ND<20 ND<20 ND<20 <br /> 60' ND<0 3 ND<0 3 ND<0 3 ND<0 6 ND<50 N/A ND<20 ND<20 ND<20 ND<20 ND<20 <br /> 9/30/1997 SP-5 40' ND<0 3 ND<0 3 ND<0 3 ND<0 6 ND<50 N/A ND<20 ND<20 ND<20 ND<20 ND<20 <br /> 10/8/1997 SP-5A 60' ND<0 3 ND<0 3 ND<0 3 ND<0 6 71 N/A ND<20 j ND<20 ND<20 ND<20 ND<20 <br /> i <br /> 9/30/1997 SP-6 60' ND<0 3 ND<0 3 ND<0 3 ND<0 6 780 NIA ND<20 ND<20 ND<20 ND<20 ND<20 <br /> 8/20/1999 MW-101 68' 3,620 6,700 1,060 4,960 61,100 N/A ND<500 ND<500 ND<500 ND<500 ND<2,000 <br /> 98' 1,320 6,540 1,720 8,870 69,600 N/A ND<500 ND<500 ND<500 ND<500 ND<2,000 <br /> 8/21/1999 SB-201 _1115' 1,080 3,330 731 1 3,800 1 34,100 N/A ND<250 I ND<250 LNM50 I ND<250 ND<1,000 <br />