Laserfiche WebLink
CALIFORNIA LABORATORY SERVICES <br /> ' <br /> Page 20 of 20 04/27/06 13 02 <br /> GEOLOGICAL TECHNICS INC Project Castle Motors-2nd Qtr 2006 <br /> 1101 7th St Project Number [none] CLS Work Order#:CPDO649 <br /> MODESTO,CA 95354 Project Manager Joe Angulo COC## <br /> ' Notes and Definitions <br /> QM-5 The spike recovery was outside acceptance limits for the MS and/or MSD due to matrix interference The LCS and/or LCSD were <br /> within acceptance limits showing that the laboratory is in control and the data is acceptable <br /> DET Analyte DETECTED <br /> ND Analyte NOT DETECTED at or above the reporting limit <br /> ' NR Not Reported <br /> dry Sample results reported on a dry weight basis <br /> ' RPD Relative Percent Difference <br /> 1 <br /> CA DOHS FLAP Accreditation/Registration Number 1233 <br /> 3249 Fitzgerald Road Rancho Cordova,CA 95742 www.californtalab.com 916-638-7301 Fax- 916-638-4510 <br />