Laserfiche WebLink
ENVIRONMENTAL HEALTH EPARTMENT <br /> i SAN JOAQUIN COUNTY Unit Supervisors <br /> e l ? Donna K.Heran R.E.H.S. <br /> Director 304 East Weber Avenue, Third Floor Carl Bergman,R.E.H.S.Alolsen;R.E.H.S. <br /> -2708 <br /> Mike Huggins,R.E.H.S.,R.D.I <br /> . <br /> Program Manager Stockton, California 95202 Douglas W.Wilson,R.E.H.S. <br /> Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> �1 p o Laurie A.Cotulla,R.E.H.S. <br /> Program Manager Fax: (209) 464-0138 Robert McClellon,R.E.H.S. <br /> Mark Barcellos,R.E.H.S. <br /> I � <br /> DENIS L BROWN JIM 2 4 l005 <br />{ SHELL OIL PRODUCTS <br /> 1 u 20945 S WILMINGTON <br /> CARSON CA 90810-1039 <br /> i <br /> RE: SHELL Sites in San Joaquin County <br /> I <br /> 1 A meeting was held on June 9, 2005,at the office of San Joaquin County Environmental Health <br /> Department(EHD). Attending the meeting were you representing Shell Oil,Joe Neely and Aubrey <br /> Cool representing Cambria Environmental Technology,Inc., and Margaret Lagorio,Nuel C. <br /> Henderson,Jeff Wong,Harlin Knoll,Michael Infurna,Lori Duncan, and Vicki McCartney <br /> representing EHD. There was a general discussion about preparing cross sections that have <br /> lithological correlations with interpretations of the subsurface and including them in site conceptual <br /> { models (SCM) prepared for each site. The following is a synopsis of the status and/or site specific <br /> discussions at the meeting. <br /> I <br /> 3011 Benjamin Holt Stockton <br /> A third geologic cross section is to be prepared that extends from the contaminant source area to <br /> newly installed monitoring well MW13 and is to be included in an updated SCM. In the conclusions <br /> and recommendations of the August 14,2004, SCM,it was stated that MTBE was no longer a fuel- <br /> component at this site, that concentrations of MTBE were declining and expected to continue <br /> declining and that case closure may be warranted. If this is the conclusion and recommendation of <br /> the updated SCM, then a closure report should be prepared as discussed in the Tri-Regional Board <br /> I Staff Recommendations dated April 16,2004. <br /> 1313 Charter Way, Stockton <br /> An SCM is to be prepared for this site and can be included in the next quarterly monitoring report. <br /> The contaminant of concern at this site is 1,2-DCA. If it can be demonstrated that the 1,2-DCA <br /> plume has been adequately characterized on-site and off-site and that action to remediate the mass of <br /> contamination is not necessary, then a closure report should be prepared as discussed in the Tri- <br /> Regional Board Staff Recommendations dated April 16,2004. <br /> i 620 Charter Way, Stockton <br /> The comments provided in the EHD letter dated May 18, 2005,were discussed. It was agreed that <br /> CPT borings would be advanced and the data would be used to decide where monitoring wells <br /> would be installed. <br /> 440 Charter Way,Stockton <br /> It was stated that the off-site property owner had not responded to the access agreement request. <br /> Cambria will follow up on securing an access agreement and proceed with implementation of the <br /> work plan approved December 13,2004. <br />